The ISM Code is a part of ()

题目
单选题
The ISM Code is a part of ()
A

SOLAS

B

MARPOL

C

STCW

D

Ballast Water convention

参考答案和解析
正确答案: D
解析: 暂无解析
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

5 (a) IFAC’s ‘Code of Ethics for Professional Accountants’ is divided into three parts:

Part A – Applicable to All Professional Accountants

Part B – Applicable to Professional Accountants in Public Practice

Part C – Applicable to Employed Professional Accountants

Required:

Distinguish between ‘Professional Accountants’, ‘Professional Accountants in Public Practice’ and ‘Employed

Professional Accountants’. (3 marks)


正确答案:
5 BOLEYN & CO
(a) Professional Accountants
■ Professional Accountants are members of an IFAC member body. They may be:
– in public practice or employed professionals;
– a sole practitioner, partnership or corporate body.
■ Professional Accountants in Public Practice (‘practitioners’) are:
– each partner (or person occupying a position similar to that of a partner); and
– each employee in a practice providing professional services to a client irrespective of their functional classification
(e.g. audit, tax or consulting); and
– professional accountants in a practice having managerial responsibilities.
This term is also used to refer to a firm of professional accountants in public practice.
■ Employed Professional Accountants are professional accountants employed in industry, commerce, the public sector or
education.

第2题:

The requirements of the ISM Code may be applied to

A.only oil tankers

B.only passenger ships

C.only containers

D.all kinds of ships


正确答案:D

第3题:

下列有关ISM规则说法,正确的是______。Ⅰ、ISM规则是自愿执行式规则Ⅱ、ISM规则必须强制执行Ⅲ、ISM规则的侧重点在于加强安全管理机制,提高人员素质Ⅳ、ISM规则也侧重于船舶技术方面

A.Ⅰ+Ⅳ

B.Ⅱ+Ⅳ

C.Ⅱ+Ⅲ

D.Ⅰ+Ⅱ


正确答案:C

第4题:

“票价类别”代码由以下几类代码组成。()

  • A、季节代码(SEASON CODE)
  • B、星期代码(PART OF WEEK)
  • C、日代码(PART OF DAY CODE)
  • D、票价和旅客类别代码(FARE AND PASSENGER TYPE CODE)

正确答案:A,B,C,D

第5题:

The installation and provision of fire fighting equipment is mainly subject to ___.

A.ISM code

B.ISPS code

C.IBC code

D.FSS code


正确答案:D

第6题:

Which three tasks can be performed by using the performance Schema?()

A.Finding queries that are not using indexes

B.Finding rows that are locked by InnoDB

C.Finding client connection attributes

D.Finding the part of a code in which a single query is spending time

E.Finding the size of each table


参考答案:A, B, C

第7题:

The installation and prevision of fire fighting equipment is mainly subject to

A.ISM Code

B.ISPS Code

C.IBC Code

D.FSS Code


正确答案:D

第8题:

(b) ‘Strategic positioning’ is about the way that a company as a whole is placed in its environment and concerns its

‘fit’ with the factors in its environment.

With reference to the case as appropriate, explain how a code of ethics can be used as part of a company’s

overall strategic positioning. (7 marks)


正确答案:
(b) Code of ethics and strategic positioning
Strategic positioning is about the way that a whole company is placed in its environment as opposed to the operational level,
which considers the individual parts of the organisation.
Ethical reputation and practice can be a key part of environmental ‘fit’, along with other strategic issues such as generic
strategy, quality and product range.
The ‘fit’ enables the company to more fully meet the expectations, needs and demands of its relevant stakeholders – in this
case, European customers.
The ‘quality’ of the strategic ‘fit’ is one of the major determinants of business performance and so is vital to the success of
the business.
HPC has carefully manoeuvred itself to have the strategic position of being the highest ethical performer locally and has won
orders on that basis.
It sees its strategic position as being the ethical ‘benchmark’ in its industry locally and protects this position against its parent
company seeking to impose a new code of ethics.
The ethical principles are highly internalised in Mr Hogg and in the company generally, which is essential for effective strategic
implementation.

第9题:

What publications should a GMDSS Operator consult regarding the proper set-up and operation of vessel equipment ________.

A.ITU Publications

B.The manufacturers instruction manuals

C.Part 90 of the FCC Rules and Regulations

D.Code of Federal Regulations,Title 47,Part 80,Subpart W


正确答案:B

第10题:

Which three tasks can be performed by using the performance Schema?()

  • A、Finding queries that are not using indexes
  • B、Finding rows that are locked by InnoDB
  • C、Finding client connection attributes
  • D、Finding the part of a code in which a single query is spending time
  • E、Finding the size of each table

正确答案:A,B,C

更多相关问题