all survival craft are lowered to the water,launched,and operated for thirty minutes
all davits used for launching liferafts are operated
each emergency position indicating radio beacon is tested for thirty minutes
the helicopter pad landing lights are operating in a quick-flashing mode
第1题:
During an abandonment or drill,the first person to arrive at the survival craft should ______.
A.pass out food and water to personnel
B.open the doors and start the sprinkler system
C.activate the emergency release handle
D.open the doors and prepare the craft for boarding
第2题:
When must the Master or person in charge of a ship log the position of load line marks in relation to the surface of the water in the logbook?
A.Once a day
B.At the change of every watch
C.Only when in fresh or brackish water
D.Prior to getting underway
第3题:
The air cylinder bottles in the survival craft should be refilled with ______.
A.oxygen
B.nitrogen
C.compressed air
D.nitrogen and oxygen
第4题:
right the craft in case of capsizing
increase area for radar detection
act as a sail in case of a power loss
steady the craft in heavy seas
第5题:
The person in charge on the vessel and the person in charge at the facility must hold a meeting before starting the transfer of oil.Who must decide to start the transfer ________.
A.The person in charge on the vessel
B.The person in charge at the facility
C.Both persons in charge
D.The person in charge of either place that is doing the pumping
第6题:
A survival craft being used to pick up a person who has fallen overboard from a ship should approach the person ______.
A.at a high rate of speed
B.under oars
C.against the wind
D.with the wind
第7题:
Which step should be taken,if possible,when the vessel must be abandoned because of a distress situation ________.
A.Alert the Coast Guard by using the survival craft's portable INMARSAT unit
B.Program the SART and EPIRB to transmit the vessel's location and situation
C.Place the SART and EPIRB in the“ON”position and secure them to the survival craft
D.No additional steps are needed as the SART and EPIRB will both automatically float free and operate properly
第8题:
What must the Master or person in charge of a ship enter in the logbook after conducting a boat drill?
A.Which survival craft was used in the drill
B.The number of each lifeboat not lowered during each drill
C.Only the number of each motor propelled lifeboat that is lowered
D.The length of time an oar propelled lifeboat is rowed
第9题:
An on-load release system on a survival craft means the cable can be released ______.
A.only when the load is taken off the cable
B.only when there is a load on the cable
C.only when activated by the controls at the lowering station
D.at any time
第10题:
hydraulic system
pneumatic system
spare battery
hand crank