(),the cargo plan is not well done.

题目
单选题
(),the cargo plan is not well done.
A

Frank speaked

B

Frankly to speak

C

Frankly spoken

D

Frankly speaking

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

The tentative cargo plan ________ .

A.eliminates confusion with the final stowage plan

B.shows the approximate amount of cargo to be loaded in each hold

C.expedites the total operation

D.requires an unproportional number of gang hours of work to discharge the cargo


正确答案:B

第2题:

The capacity of the segregated ballast tanks shall be ______ determined that the ship may operate safely on ballast voyages without recourse to the use of cargo tanks for water ballast except as provided otherwise.

A.Such

B.As

C.So

D.Well


正确答案:C

第3题:

Boss:Come in,please.Oh,Mary,come over 56 .Your annual report is well done.


正确答案:
[答案] B

第4题:

Manifest and cargo plan are the two most important shipping papers required for ______.

A.discharging planning

B.safety inspection

C.entry report

D.provision order


正确答案:A
舱单和货物积载图是两份最重要的卸货计划必须的货运文件。

第5题:

To determine the weight capacity of a deck in a cargo hold,you would refer to the ______.

A.Deadweight scale

B.Deck capacity plan

C.Cubic capacity tables

D.General arrangement plan


正确答案:B

第6题:

A Master would be well advised to file a note of protest if ______.

A.Portions of his vessel’s cargo were illegally impounded

B.Longshore labor went on strike in a port causing undue vessel delay

C.Cargo was received at ship side which was damaged in land transit

D.The vessel encountered heavy weather which might have caused bottom damage


正确答案:D

第7题:

Which statement is TRUE concerning deep well self-priming pumps ________.

A.When loading oil cargo,it is always loaded via the discharge line through to the pump until the tank is topped off

B.Stripping systems are generally eliminated for the purposes of cargo handling

C.In recent years deep well pumps have become increasingly unpopular in product tankers and medium size crude ships

D.There is no danger of damaging the pump from overheating


正确答案:B

第8题:

– What do you think of this business plan? -- _______________.

A、Excuse me.

B、I think it’s perfect.

C、Very well.

D、That’s fine.


正确答案:B

第9题:

Before loading bulk grain, bilge wells must be covered to ______.

A.add strength to the bilge well strainer

B.permit rapid flow of water to the bilge wells

C.prevent cargo sifting into the bilge wells

D.prevent oil, water, or other liquid from reaching the cargo


正确答案:C
在装载散装谷物之前,(舱底)污水井必须被盖上以防止货物进入其中。

第10题:

()is the process of identifying individual project risks as well as source of overall project risk,and documenting their characteristics.

A.identify risks
B.monitor risks
C.implement risks responses
D.plan risk management

答案:A
解析:
翻译:()是识别单个项目风险以及整个项目风险的来源,并记录其特征的过程。
A.识别风险
B.监控风险
C.实施风险应对措施
D.计划风险管理
识别风险是识别单个项目风险以及整个项目风险的来源,并记录其特征的过程。