()are supplied by main switchboard directly.

题目
单选题
()are supplied by main switchboard directly.
A

Suez Canal searchlight, air compressor and air conditioning compressor

B

Air compressor, boiler blower and refrigeration plant

C

Boiler blower, Suez Canal searchlight and refrigeration plant

D

Suez canal searchlight, air compressor and boiler blower

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

The upper piston rings m large, slow-speed, two-stroke/cycle diesel engines are most effectively lubricated by oil ____.

A.fed from mechanical lubricators

B.thrown off from the main bearings

C.supplied from wick fed drip lubricators

D.flow from a centrifugal or banjo oiler


正确答案:A

第2题:

For _______the power is supplied by main switchboard directly not through sub-board

A.saving network cost

B.improving the reliability of supplying power to important load

C.preventing sequence reversing

D.increasing the power Factor of important load


正确答案:B

第3题:

The database was supplied by a scientific research ().

A、party

B、institute

C、people

D、society


参考答案:B

第4题:

单选题
()is not installed on the main switchboard.
A

Ammeter and changeover switch

B

Power factor meter

C

Synchroscope

D

Reverse sequence relay


正确答案: D
解析: 暂无解析

第5题:

单选题
()is not installed on the emergency switchboard.
A

Ammeter and changeover switch

B

Speed governor device

C

Synchroscope

D

Wattmeter


正确答案: B
解析: 暂无解析

第6题:

Lubrication for the main reduction gears used with diesel engines is usually supplied by

A.oil from the main engine sump

B.an independent lube oil system

C.the stern bearing head tank

D.the stem bearing sump tank


正确答案:B

第7题:

When a router is connected to a Frame Relay WAN link using a serial DTE interface, how is the interface clock rate determined()。

  • A、It is supplied by the CSU/DSU.
  • B、It is supplied by the far end router.
  • C、It is determined by the clock rate command.
  • D、It is supplied by the Layer 1 bit stream timing.

正确答案:A

第8题:

Where could you monitor the correct instant for synchronizing without aid of synchroscope or synchronizing lamp?

A.Distribution board

B.Section board

C.Emergency switchboard

D.Main switchboard


答案:C

第9题:

单选题
()is not installed on the emergency switchboard.
A

Ammeter

B

Voltmeter

C

Wattmeter

D

Synchroscope


正确答案: A
解析: 暂无解析

第10题:

单选题
The frequency of an alternator is controlled from the main switchboard by adjusting the()
A

frequency meter

B

voltage regulator

C

governor control

D

sychroscope switch


正确答案: C
解析: 暂无解析

更多相关问题