第1题:
Statistical cost estimating techniques (based upon history), are called _____ estimates and are a _____ approach.
A . Definitive, bottom up.
B . Analogy, top down.
C . Parametric, bottom up.
D . Parametric, top down.
E . Analogy, bottom up.
第2题:
50 Statistical cost estimating techniques (based upon history), are called _____ estimates and are a _____ approach.
A. Definitive, bottom up.
B. Analogy, top down.
C. Parametric, bottom up.
D. Parametric, top down.
E. Analogy, bottom up.
第3题:
The scope of a project can be expected to change if:
A.The project manager must provide cost estimates without having a design concept
B.Oversimplification (underestimating) of the nature of the work occurs
C.The project manager is assigned after the project is defined, and the cost and schedule are approved
D.A clear objective is not provided
E.All of the above are possible based upon the situation
第4题:
总固定成本〔Total cost)
总固定成本是指每个时期厂商在不变投入品上的总支出。
第5题:
123 The scope of a project can be expected to change if:
A. The project manager must provide cost estimates without having a design concept B. Oversimplification (underestimating) of the nature of the work occurs
C. The project manager is assigned after the project is defined, and the cost and schedule are approved D. A clear objective is not provided
E. All of the above are possible based upon the situation
第6题:
104 A network has been developed with resources from six different departments. One of the six departments has just informed you that they can increase the number of employees from 5 to 8. This will result in:
A. A shortening of the critical path.
B. A shortening of the noncritical path.
C. A decrease in the total cost of the project.
D. An increase in the cost of the project.
E. A through D are possible based upon where the resources are deployed
第7题:
41 The scope of a project can be expected to change if:
A. The project manager must provide cost estimates without having a design concept B. Oversimplification (underestimating) of the nature of the work occurs
C. The project manager is assigned after the project is defined, and the cost and schedule are approved
D. A clear objective is not provided
E. All of the above are possible based upon the situation
第8题:
A network has been developed with resources from six different departments. One of the six departments has just informed you that they can increase the number of employees from to . This will result in:
A.A shortening of the critical path.
B.A shortening of the noncritical path.
C.A decrease in the total cost of the project.
D.An increase in the cost of the project.
E.A through D are possible based upon where the resources are deployed.
第9题:
● The scope of a project can be expected to change if:
A The project manager must provide cost estimates without having a design concept
B Oversimplification (underestimating) of the nature of the work occurs
C The project manager is assigned after the project is defined, and the cost and schedule are approved
D A clear objective is not provided
E All of the above are possible based upon the situation
第10题:
By default, which of the following factors determines the spanning-tree path cost?
A.It is the individual link cost based on latency
B.It is the sum of the costs based on bandwidth
C.It is the total hop count
D.It is dynamically determined based on load
E.None of the above