The expenses for the loading of trucks and heavy cargo and t

题目
单选题
The expenses for the loading of trucks and heavy cargo and the necessary materials for lashing thereof will be charged to()account.
A

the supercargo's

B

the shipper's

C

the shipowner's

D

carrier's

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Please kindly arrange for shore workers to do ______ during loading the heavy cargo on deck as soon as possible.

A.the work of using lines and chains to secure the cargo on board

B.the lash work

C.the work of putting dunnage,keeping the cargo in position and not move when the ship is rolling and pitching

D.the lashing work


正确答案:D

第2题:

Concentrated heavy loads are involved in loading a LASH vessel. What does NOT require close attention due to such loads while working cargo?______.

A.GM – available and required

B.Longitudinal stress numeral

C.Tons per inch immersion numeral

D.Draft


正确答案:C
涉及到子母船的集中大量装载。在这一类货物操作中,什么不需要被密切注意?每英尺浸没吨数

第3题:

We’ll finish loading the trucks soon. Please get ready for ________

A.lashing

B.discharging

C.loading

D.tightening


正确答案:A

第4题:

Heavy cargo might break ()cargo, so it can’t be stowed on top of it.

  • A、light
  • B、bulk
  • C、dangerous
  • D、wet

正确答案:A

第5题:

翻译:any lightrage at loading and discharging port to be at charterers’ risk and expenses and time used to count as laytime


正确答案:装卸港口所需的任何驳船,其费用和风险均由租船人负责,所需时间作为装卸时间计算

第6题:

______ refers to the stowage of cargo in a block of two or more adjoining cargo holds with the cargo holds adjacent to the block of loaded cargo holds empty.

A.Alternate hold loading condition

B.Block hold loading condition

C.Part hold loading condition

D.Homogeneous hold loading condition


正确答案:B

第7题:

翻译:shore tallyman to be employed by the vessel at the expenses to the vessel ,both at loading and discharging port


正确答案:在装卸港所需岸上理货人员,由船方雇佣并负担费用

第8题:

Preparations for loading cargo on board ship.


正确答案:Before loading cargo, we should get the ship ready for loading, the preparation includes cleaning the cargo holds, decks, preparing dunnage, and derricks or cranes if fitted, and so on.

第9题:

翻译:Neither the consignee nor the holder of the bill of lading shall be liable for the demurragedead freight and all other expenses in respect of loading occurred at the loading port unless the bill of lading clearly states that the aforesaid demurragedead freight and all other expenses shall be borne by the consignee and the holder of the bill of lading。


正确答案:收货人、提单持有人不承担在装货港发生的滞期费、亏舱费和其他与装货有关的费用,但是提单中明确载明上述费用由收货人、提单持有人承担的除外

第10题:

重吊杆用于吊大的重件。()

  • A、Heavy derrick is used for lifting large heavy cargo.
  • B、Derrick is used for lifting large heavy cargo.
  • C、Heavy derrick is used for lifting dry bulk cargo.
  • D、Derrick is used for lifting dry bulk cargo.

正确答案:A

更多相关问题