The loading of the ship must be done in accordance with().

题目
单选题
The loading of the ship must be done in accordance with().
A

the ship’s instructions

B

the terminal’s instructions

C

the port captain’s instructions

D

the charterer’s instructions

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

When off loading garbage to another ship, your records must identify that ship by name and ______.

A.home port

B.operator's name of record

C.official number

D.master's name


正确答案:C

第2题:

A charterer is unable to complete the loading of a vessel during the lay days specified in the charter party. Under these circumstances,the ______.

A.vessel operator can collect demurrage

B.ship is authorized extra time to discharge the cargo

C.charterer must pay dispatch money

D.effective period of the charter is extended


正确答案:A

第3题:

The work was done()her instructions.

A. according to

B. according with

C. accordance with


参考答案:A

第4题:

The ship is listing too much due to your faulty method in loading operation.You must keep her ______.

A.flat

B.up

C.upright

D.vertical


正确答案:C

第5题:

The Charterers to have the privilege of loading a full cargo on deck and/or on hatches in accordance with _______ at their expense.

A.common custom

B.marine usual doing

C.normal marine practice

D.general and convenience usage


正确答案:C

第6题:

No damage of any kind ______ aids to navigation or navigation facilities.

A.should be done to

B.should not be done to

C.must be done with

D.must not be done with


正确答案:A

第7题:

The carrier shall be bound before and at the beginning of the voyage to exercise due diligence to ______.

A.make the ship seaworthy

B.prepare the cargo properly for the carriage

C.clean the holds before discharging the goods and/or after loading the goods

D.train crew members in accordance with all regulations concerned


正确答案:A

第8题:

Preparations for loading cargo on board ship.


正确答案:Before loading cargo, we should get the ship ready for loading, the preparation includes cleaning the cargo holds, decks, preparing dunnage, and derricks or cranes if fitted, and so on.

第9题:

When loading containers into the cell guides in the hold of a container ship,which statement is TRUE ________.

A.No further securing is usually required

B.Containers must have vertical lashings if they do not have twist lock securing

C.All containers must have vertical and horizontal lashings

D.The container must be locked into the cell guide


正确答案:A

第10题:

During loading or discharging,the tallymen must make contact with______on duty so as to solve problems in time.

A.ship owner

B.ship’s officers

C.Consignors

D.shippers


正确答案:B
在装卸货期间,理货员应该和值班驾驶员联络一边及时解决问题。

更多相关问题