decelerating when lowering the load
decelerating when raising the load
lowering the load at constant speed
raising the load at constant speed
第1题:
Which cargo would require a dangerous cargo manifest ________.
A.Cotton
B.Wheat
C.Sugar
D.Lumber
第2题:
Dismantle and check the cargo runner.()
第3题:
______ of this Deratting Exemption Certificate is hereby extended until 4th Oct.2007 as the vessel is laden with cargo.
A.Validity
B.Valid
C.Validation
D.The coming into force
第4题:
Validity
Valid
Validation
The coming into force
第5题:
coming into effect
moving to full effect
being based on force
coming into force
第6题:
Bulk cargo refers to ______.
A.cargo which occupies a large volume of space
B.cargo which requires refrigeration
C.cargo which is very dense
D.homogeneous cargo not enclosed in a container
第7题:
Which of the following is not dangerous cargo?()
第8题:
An inert gas system installed on a tanker is designed to ______.
A.aid in the stripping and cleaning of cargo tanks
B.increase the rate of discharge of cargo
C.force toxic and explosive fumes from a cargo tank to vent to the outside atmosphere
D.lower the oxygen levels inside cargo tanks,making explosion nearly impossible
第9题:
Put on the sling hooks.
Put up the sling hooks.
Put on the chain hooks.
Put on the cargo runner.
第10题:
placing bunker on the deck
building a stage on which to place the cargo
welding steel feet to the deck,on which the cargo is placed
erecting vertical pillars under the deck to support the cargo