Your environment includes Hyper-V and VMware ESX. You manage

题目
单选题
Your environment includes Hyper-V and VMware ESX. You manage your virtual environment by using Microsoft System Center Virtual Machine Manager (VMM) 2008 R2. You plan to perform a virtual-tovirtual (V2V) conversion of a virtual machine (VM) that is located on the ESX server. You start the conversion by using the Convert Virtual Machine Wizard. Communication between the destination host and the ESX server fails, and the conversion does not finish successfully. You need to ensure that the conversion finishes successfully.  What should you change?()
A

WSMan permissions and settings

B

Server Message Block (SMB) settings

C

Secure Shell (SSH) and HTTPS settings

D

Windows Firewall exceptions for Background Intelligent Transfer Service (BITS)

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Your organization has an Active Directory Domain Services (AD DS) domain. All client computers run Windows 7. You use Microsoft System Center Virtual Machine Manager (VMM) 2008 R2 to manage your Hyper-V hosts. Your environment includes Microsoft Enterprise Desktop Virtualization (MED-V). You plan to deploy a virtual machine (VM) image to all client computers. You need to ensure that user state information is maintained between sessions in the VM. What should you do? ()

  • A、Use VMM to configure placement settings.
  • B、Configure a MED-V revertible workspace policy.
  • C、Configure a MED-V persistent workspace policy.
  • D、Use Hyper-V Manager to create a revert snapshot.

正确答案:C

第2题:

Your environment includes a Windows Server 2008 R2 Hyper-V failover cluster. You manage the virtual environment by using Microsoft System Center Virtual Machine Manager (VMM) 2008 R2.  You plan to perform maintenance on the Hyper-V failover cluster. You need to complete the maintenance on the failover cluster while maximizing the uptime of the virtual machines (VMs).  What should you do prior to starting maintenance on each cluster node?()

  • A、Use Failover Cluster Manager to pause the cluster node
  • B、Use Failover Cluster Manager to perform a quick migration of all VMs to another cluster node
  • C、Use VMM to place the cluster node in maintenance mode
  • D、Use VMM to pause all VMs and move them to another cluster node

正确答案:C

第3题:

Your virtual environment includes a Windows Server 2008 R2 Hyper-V failover cluster. You manage the environment by using Microsoft System Center Virtual Machine Manager (VMM) 2008 R2. You need to configure the live migration network priorities for all virtual machines (VMs). What should you do?()

  • A、Enable Cluster Shared Volumes (CSVs).
  • B、In Failover Cluster Manager, edit the properties of a single VM.
  • C、In Virtual Network Manager, edit the properties of the virtual network.
  • D、In Hyper-V Manager, take each VM offline and edit the settings of each VM.

正确答案:B

第4题:

Your network environment includes the following elements: Two Windows Server 2008 R2 Hyper-V serversTwo VMware ESX 3.5 serversMicrosoft System Center Virtual Machine Manager (VMM) 2008 R2   You run several Windows Server 2003 virtual machines (VMs) on your ESX host servers. You need to convert the ESX VMs to Hyper-V, and you must minimize the downtime during the conversion.  What should you do?()

  • A、Run the New-V2V PowerShell cmdlet
  • B、Perform a physical-to-virtual (P2V) conversion while the VMs are running
  • C、Shut down the VMs, and then perform a virtual-to-virtual (V2V) conversion
  • D、Shut down the VMs, and then perform a physical-to-virtual (P2V) conversion

正确答案:B

第5题:

Your environment includes multiple Windows Server 2008 R2 Hyper-V servers. You manage the virtual environment by using Microsoft System Center Virtual Machine Manager (VMM) 2008 R2. You plan to place multiple Hyper-V servers in the perimeter network (also known as DMZ). You need to be able to manage the Hyper-V servers by using VMM.  Which two actions should you perform for each server in the perimeter network?()

  • A、Create a local administrative account
  • B、Perform a VMM local agent installation
  • C、Open port 8100 in the Windows firewall
  • D、Copy the security file to the VMM Administrator Console, and then run the Add Hosts Wizard

正确答案:B,D

第6题:

You are configuring a new Microsoft System Center Virtual Machine Manager (VMM) 2008 R2  environment to manage your existing virtual infrastructure. The existing infrastructure includes Windows Server 2008 R2 host servers and VMware ESX host servers. You need to add a VMware ESX host server named Host1 to your VMM environment. What should you do?()

  • A、In the Computer name field of the Add VMware VirtualCenter server dialog box, type the fully qualified domain name (FQDN) of Host1.
  • B、In the Computer name field of the Add VMware VirtualCenter server dialog box, type the fully qualified domain name (FQDN) of the VMware VirtualCenter server that manages Host1.
  • C、In the Add Hosts wizard, select the VMware ESX Server host (any location) option. In the Computer name field, type the fully qualified domain name (FQDN) of Host1.
  • D、In the Add Hosts wizard, select the VMware ESX Server host (any location) option. In the Computer name field, type the fully qualified domain name (FQDN) of the VMware VirtualCenter server that manages Host1.

正确答案:B

第7题:

Your virtual environment includes Windows Server 2008 R2 Hyper-V servers. You manage the environment by using Microsoft System Center Virtual Machine Manager (VMM) 2008 R2. You are planning to install an application upgrade. Testing the production application requires access to the following three virtual machines (VMs): a domain controller, a server that runs Microsoft SQL Server, and an IIS Web server. You need to test the application upgrade in a virtual environment that is isolated from the production network. Which two sets of actions should your plan include?()

  • A、Import the checkpoint into the test environment, and apply the application update for testing
  • B、Create a checkpoint of the three VMs, and export the checkpoint to the test environment
  • C、Create three VMs in the test environment, attach the existing .vhd files, and apply the application update for testing
  • D、Pause the three VMs, and copy the .vhd files to the test environment

正确答案:A,B

第8题:

.Your companys virtual environment includes Windows Server 2008 R2 Hyper-V servers. You manage the environment by using Microsoft System Center Virtual Machine Manager (VMM) 2008 R2. You need to provide a user with the ability to perform only the Create, Delete, Start, Stop, Pause, Resume, and Shut Down virtual machine (VM) management tasks on your host servers .  What should you do?()

  • A、In VMM,create a Self-Service user role.
  • B、In VMM,create a Delegated Administrator user role.
  • C、In VMM,assign the Local Administrator permission for the host servers to the user.
  • D、In Authorization Manager, create a role on the users client computer and add the user to this role.

正确答案:A

第9题:

You are configuring your Microsoft System Center Virtual Machine Manager (VMM) 2008 R2  environment. A VMware ESX 3.5 host server named Host1 is added to the existing VMware Infrastructure 3 (VI3) environment that you manage by using VMM. You need to add Host1 to your VMM environment. What should you do?()

  • A、In the Computer name field of the Add VMware VirtualCenter server dialog box, type the fully qualified domain name (FQDN) of Host1.
  • B、In the Computer name field of the Add VMware VirtualCenter server dialog box, type the fully qualified domain name (FQDN) of the VMware VirtualCenter server that manages Host1.
  • C、In the Add Hosts wizard, select the VMware ESX Server host (any location) option. In the Computer name field, type the fully qualified domain name (FQDN) of Host1.
  • D、In the Add Hosts wizard, select the VMware ESX Server host (any location) option. In the Computer name field, type the fully qualified domain name (FQDN) of the VMware VirtualCenter server that manages Host1.

正确答案:C

第10题:

Your company has a Microsoft Hyper-V Server 2008 R2 environment. You manage the virtual environment by using Microsoft System Center Virtual Machine Manager (VMM) 2008 R2. You are creating a virtual test environment by installing two child partitions. The test environment must be completely isolated from all production servers. You need to ensure that the child partitions can communicate with each other. Which connection type should you configure?()

  • A、Private
  • B、Internal
  • C、External
  • D、Dedicated host

正确答案:A

更多相关问题