The ()(包装货) is loaded and unloaded by cargo sling.

题目
单选题
The ()(包装货) is loaded and unloaded by cargo sling.
A

bagged cargo

B

packed cargo

C

cased cargo

D

deck cargo

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Deadfreight is the charge for the ______.

A.carriage of demise cargo

B.cost of transshipment of over-carried cargo

C.difference in the amount of cargo loaded and the amount of cargo discharged

D.difference in the amount of cargo loaded and the amount of cargo booked,through no fault of the vessel


正确答案:D

第2题:

______ refers to the stowage of cargo in a block of two or more adjoining cargo holds with the cargo holds adjacent to the block of loaded cargo holds empty.

A.Alternate hold loading condition

B.Block hold loading condition

C.Part hold loading condition

D.Homogeneous hold loading condition


正确答案:B

第3题:

The adoption of containers facilitated()to a great extent.

A、to load and unload

B、the loading and unloading

C、us to load and unload

D、to have loaded and unloaded


参考答案:B

第4题:

单选题
()may be laid ready for the cargo or may just be put in bundles ready for the stevedores to lay out as the cargo is loaded.
A

Wedge

B

Dunnage

C

Shore

D

Store


正确答案: C
解析: 暂无解析

第5题:

A bonding cable should be connected for cargo operations aboard a tank vessel as soon as the ______.

A.Cargo has been loaded or discharged

B.Cargo hose is connected

C.Cargo pumps are started

D.Vessel is ready to handle cargo


正确答案:D

第6题:

Yesterday afternoon 2 cargo surveyors appointed by the consignee came on board for investigation. I told them the cargo was loaded between Aug. 14th. and 16th. Under favorable weather without any remarks on __________.

A.log book

B.short/over-loaded cargo list

C.the mate’s receipt

D.manifest


正确答案:C

第7题:

Cargo securing for Ro-Ro is based on the concept of _______.

A.Solid packing

B.Rapid loading and discharge

C.Vessel loaded full and down to her marks

D.Palletized cargo


正确答案:B

第8题:

The tentative cargo plan ________ .

A.eliminates confusion with the final stowage plan

B.shows the approximate amount of cargo to be loaded in each hold

C.expedites the total operation

D.requires an unproportional number of gang hours of work to discharge the cargo


正确答案:B

第9题:

The()(非包装货) is loaded and discharged by belt conveyer.

  • A、non-packed cargo
  • B、packed cargo
  • C、cased cargo
  • D、inboard cargo

正确答案:A

第10题:

单选题
Yesterday afternoon 2 cargo surveyors appointed by the consignee came on board for investigation. I told them the cargo was loaded between Aug.14th.and 16th. Under favorable weather without any remarks on().
A

log book

B

short/over-loaded cargo list

C

the mate's receipt

D

manifest


正确答案: D
解析: 暂无解析

更多相关问题