Run cabling and power to the warm site.
Restore data to the equipment.
Transfer all data tapes over to the warm site.
Restore least critical applications online to test to make sure the site is functioning.
第1题:
Which three are benefits of A virtualized data center solution over A typical implementation?()
第2题:
Which of the following disaster recovery sites requires power and cabling to be run before it can be used?()
第3题:
An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times ready for failover. It must contain equipment and the ability to restore data from the data center.Which of the following site types should be considered to meet these requirements?()
A. Hot site
B. Warm site
C. Cold site
D. Active failover site
第4题:
Which of the following is the BEST sequence to bare metal restore a server?()
第5题:
Which of the following should be done FIRST to a hard drive before it is disposed?()
第6题:
A customer needs the ability to recover their data if a total system failure occurs. Which two of the following are the most important considerations in determining the solution?()
第7题:
A failure of the primary data center has occurred. A warm site is available for use. Which of the following should be done FIRST to bring the critical applications online?()
第8题:
A customer has one IBM System Storage DS8700 in their main data center with one DS6800 at a secondary site. They are using the Global Copy feature between the sites. They want to bring up a test image at the secondary site using the primary site data.Which sequence of actions will properly bring up the secondary site?()
A. bring up the secondary site on the target disks
B. suspend and bring up the secondary site on the target disks
C. perform a FlashCopy and bring up the secondary site on the target disks
D. "go-to-sync", perform aFlashCopy, and bring up the secondary site on the target disks
第9题:
An administrator is attempting to recover from a power failure in the data center. Which of the following is the BEST way to recover the servers?()
第10题:
An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times ready for failover. It must contain equipment and the ability to restore data from the data center. Which of the following site types should be considered to meet these requirements? ()