单选题A failure of the primary data center has occurred.  A warm site is available for use.  Which of the following should be done FIRST to bring the critical applications online?()A Run cabling and power to the warm site.B Restore data to the equipment.C Tr

题目
单选题
A failure of the primary data center has occurred.  A warm site is available for use.  Which of the following should be done FIRST to bring the critical applications online?()
A

Run cabling and power to the warm site.

B

Restore data to the equipment.

C

Transfer all data tapes over to the warm site.

D

Restore least critical applications online to test to make sure the site is functioning.

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Which three are benefits of A virtualized data center solution over A typical implementation?()

  • A、more efficient power consumption
  • B、fewer applications per server
  • C、less rack space
  • D、more efficient routing
  • E、more control over each server
  • F、simplified cabling

正确答案:A,C,F

第2题:

Which of the following disaster recovery sites requires power and cabling to be run before it can be used?()

  • A、 Hot site
  • B、 Cold site
  • C、 Warm site
  • D、 Failover site

正确答案:B

第3题:

An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times ready for failover. It must contain equipment and the ability to restore data from the data center.Which of the following site types should be considered to meet these requirements?()

A. Hot site

B. Warm site

C. Cold site

D. Active failover site


参考答案:B

第4题:

Which of the following is the BEST sequence to bare metal restore a server?()

  • A、 Determine backups available, restore backups, and verify data.
  • B、 Restore applications, restore data, and verify data.
  • C、 Restore OS, restore system applications, and restore data.
  • D、 Contact end users of outage, restore backup data, and verify data.

正确答案:C

第5题:

Which of the following should be done FIRST to a hard drive before it is disposed?()

  • A、Partition
  • B、Physical damage
  • C、Data wipe
  • D、Format

正确答案:C

第6题:

A customer needs the ability to recover their data if a total system failure occurs.  Which two of the following are the most important considerations in determining the solution?()

  • A、Network utilization
  • B、Total amount of storage installed
  • C、Amount of open files in the backup
  • D、Amount of critical data in the backup or restore

正确答案:D

第7题:

A failure of the primary data center has occurred.  A warm site is available for use.  Which of the following should be done FIRST to bring the critical applications online?()

  • A、Run cabling and power to the warm site.
  • B、Restore data to the equipment.
  • C、Transfer all data tapes over to the warm site.
  • D、Restore least critical applications online to test to make sure the site is functioning.

正确答案:B

第8题:

A customer has one IBM System Storage DS8700 in their main data center with one DS6800 at a secondary site. They are using the Global Copy feature between the sites. They want to bring up a test image at the secondary site using the primary site data.Which sequence of actions will properly bring up the secondary site?()

A. bring up the secondary site on the target disks

B. suspend and bring up the secondary site on the target disks

C. perform a FlashCopy and bring up the secondary site on the target disks

D. "go-to-sync", perform aFlashCopy, and bring up the secondary site on the target disks


参考答案:D

第9题:

An administrator is attempting to recover from a power failure in the data center. Which of the following is the BEST way to recover the servers?()

  • A、 Bring up the WINS server, the DNS server, then the web server
  • B、 Bring up the web server, the time clock server, then the DHCP server
  • C、 Bring up the backup tape server, the DNS server, then the web server
  • D、 Bring up the active directory server, the DNS server, then the web server

正确答案:D

第10题:

An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times ready for failover. It must contain equipment and the ability to restore data from the data center.  Which of the following site types should be considered to meet these requirements? ()

  • A、 Hot site
  • B、 Warm site
  • C、 Cold site
  • D、 Active failover site

正确答案:B