What are the characteristics of the process of documenting the layers of an existing network? ()
A

begins with gathering organizational input that may be inaccurate

B

begins with gathering organizational input that does not need to be supplemented by a network audit

C

requires a network audit to support some upgrade decisions

D

requires a network audit to support any network restructuring

E

provides reliable input for verifying network consistency

F

does not provide reliable input for designing changes

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

● The process of choosing/documenting the best approach to achieve the project objectives is part of:

A The scope baseline.

B Scope authorization

C Scope definition

D Scope planning.

E All of the above.


正确答案:D

第2题:

●Managing risk and documenting them is very important in project planning process. You are in the process of defining key risks, including constraints and assumptions, and planned responses and contingencies. These details will be included in the (73).

(73)A. project management plan

B. project baseline

C. risk response plan

D. risk baseline


正确答案:A

第3题:

The process of choosing/documenting the best approach to achieve the project objectives is part of:

A.The scope baseline.

B.Scope authorization

C.Scope definition

D.Scope planning.

E.All of the above.


正确答案:D
D

第4题:

()is the process of documenting,analyzing,tracing,prioriiting on requirements and then controlling change and communicating to stakeholders it is a continuous process throughout a project

A.integratend management

B.configurationmanagemen

C.scopemanagement

D.requirementmanagement


正确答案:D

第5题:

Requirements management is the process of ( 73 ),analyzing, tracing,prioritizing and agreeing on requirements and then controlling changes and communicating to relevant stakeholders. It is a ( 74 ) process throughout a project. A requirement is a capability to which a project outcome (product or service) should conform.

A.communicating

B.collecting

C.filing

D.documenting


正确答案:D

第6题:

The( )process ascertains which risks have the potential of affecting the project and documenting the risks’characteristics. A.Risk Identification B.Quantitative Risk Analysis C.Qualitative Risk Analysis D.Risk Monitoring and Control


正确答案:A
风险识别(RiskIdentification)是确定何种风险可能会对项目产生影响,并将这些风险的特征形成文档。

第7题:

()is the process of determining. documenting and managing stakeholder needs and requirements to meet project objectives

A.Collecting requirements

B.Defining requirements

C.Creating WBS

D.Requirements analysis


正确答案:A

第8题:

78 The process of choosing/documenting the best approach to achieve the project objectives is part of: A. The scope baseline.

B. Scope authorization

C. Scope definition

D. Scope planning.

E. All of the above.


正确答案:D

第9题:

Requirements management is the process of (1),analyzing,tracing,prioritizing andagreeing on requirements and then controlling changes and communicating to relevantstakeholders.

A.communicating

B.collecting

C.filing

D.documenting


正确答案:D
需求管理过程是(1),分析,跟踪,优先考虑和同意的要求并控制变化和沟通,利益相关者。A、沟通B、收集C、归档D、编制

第10题:

In project time management, activity definition is the process of identifying and documenting the specific action to be performed to produce the project deliverables. ()are not output of activity definition.

A.Activity list

B.Work Breakdown Structures

C.Activity Attributes

D.Milestone Lists


正确答案:B

更多相关问题