题目
单选题
An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
A

An additional switch for the new HMc  

B

Asynchronous adapters on the new HMc

C

The two 570 servers are directly connected to the new HMc  

D

One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

The systems administrator of a large manufacturer has POWER5 and POWER6 servers, each with LPARs running AIX 6.1.  They are running several workloads including SAP, DNS, Oracle, DB2 and WebSphere Application Server, and plan to consolidate onto one POWER7 server.   How can the system administrator determine how much benefit Active Memory Expansion (AME) could provide for the consolidated system?()

  • A、Run amepat now on all of the existing LPARs.
  • B、Run amepat after consolidation on all LPARs.
  • C、Run amepat now on all existing LPARs running on the POWER6 servers.
  • D、Run amepat now on all existing LPARs running database applications.

正确答案:A

第2题:

The IP address of POWER6 595 is showing up in the HMC instead of the server name.Next to the IP address is the status,which shows Failed Authentication.The system administrator needs to enter a password.  Which password is needed to restore connection for the POWER6 595 to the HMC?()

  • A、The hscroot user password.
  • B、The CE password.
  • C、The HMC password.
  • D、The ASM admin password.

正确答案:C

第3题:

An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC.Which infrastructure is required for the new HMC?()

A.An additional switch for the new HMC

B.Asynchronous adapters on the new HMC

C.The two 570 servers are directly connected to the new HMC

D.One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC


参考答案:A

第4题:

A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()

  • A、PCIe adapters
  • B、PCI-X adapters
  • C、PCI-X andPCIe adapters
  • D、PCI, PCI-X andPCIe adapters

正确答案:A

第5题:

An administrator needs to recover an HMC due to a failed disk. The disk has been replaced, allowing the administrator to reinstall the HMC back to the required release of software. Backups of both the HMC Console Data and Upgrade Data are available. After reloading the HMC with the Recovery DVDs, what are the next steps to restore the HMC configuration?()

  • A、Use the 'HMC Management > Restore HMC Data' option to first restore just the HMC Data..
  • B、Use the 'HMC Management > Restore Upgrade Data' option to first restore just the Upgrade Data.
  • C、Use the 'HMC Management > Restore HMC Data' option to first restore the HMC Data and then the Upgrade Data.
  • D、Use the 'HMC Management > Restore Upgrade Data' option to first restore the Upgrade Data, and then the HMC Data.

正确答案:A

第6题:

Companycom recently ordered a p5 570 and an HMC. Prior to delivery, two additional p5 570 servers were added to the order. Upon installation, the system administrator noticed that they do not have a method to connect the p5 570 servers to the HMC. Which of the following will allow them to connect all servers to the HMC?()

  • A、An 8-port adapter to the HMC
  • B、A hub for the private network
  • C、An additional Ethernet card to the HMC
  • D、An additional Ethernet card for each partition

正确答案:B

第7题:

What type of network connection is recommended for HMC and POWER6 Service Processorcommunication?()  

  • A、Open
  • B、Public
  • C、Private
  • D、Virtual

正确答案:C

第8题:

An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()

  • A、An additional switch for the new HMc  
  • B、Asynchronous adapters on the new HMc
  • C、The two 570 servers are directly connected to the new HMc  
  • D、One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc

正确答案:A

第9题:

Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()

  • A、Free up one HMC and update the software for use with the p5 570
  • B、Connect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMC
  • C、Order a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570
  • D、Backup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software

正确答案:A

第10题:

A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()

  • A、All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or later
  • B、The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMC
  • C、They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based  systems connected to the existing one
  • D、The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM

正确答案:A