Run amepat now on all of the existing LPARs.
Run amepat after consolidation on all LPARs.
Run amepat now on all existing LPARs running on the POWER6 servers.
Run amepat now on all existing LPARs running database applications.
第1题:
The company has purchased one hundred and fifty new servers. The server administrator needs to build and deploy them as quickly as possible. Which of the following is the FASTEST method of building and deploying each server?()
第2题:
An existing IBM customer has a few pSeries servers running DB2 on AIX in their environment. The DB2 application contains the database for an order entry application. An xSeries SQL database server replicating from DB2 is added for off-line analysis purposes. The customer wants to know if consolidating the storage and centralized backup is possible. What are the options available to accomplish this?()
第3题:
A financial customer has three data centers that are approximately five kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds between the three sites.Which of the following solutions satisfies the customer‘s recovery time objective?()
A. DS8700 systems at each site running Metro Mirror
B. DS5300 systems at each site running Metro Mirror
C. DS5100 systems at each site running Global Mirror
D. XIV systems at each site running synchronous mirroring
第4题:
A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()
第5题:
An IT director is eager to adopt POWER7 servers because of their relative performance ratings and energy efficiency, but is concerned about migrating applications which require AIX 5.3. Which of the following will address his concern?()
第6题:
The systems administrator of a large manufacturer has POWER5 and POWER6 servers, each with LPARs running AIX 6.1. They are running several workloads including SAP, DNS, Oracle, DB2 and WebSphere Application Server, and plan to consolidate onto one POWER7 server. How can the system administrator determine how much benefit Active Memory Expansion (AME) could provide for the consolidated system?()
第7题:
A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()
第8题:
A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server. What is the minimum PowerVM edition that supports the customer requirement?()
第9题:
A pSeries technical specialist has been asked to provide a server consolidation solution to replace several AIX servers running typical commercial database workloads. Benchmarks for SPECint, SPECfp, SPECjbb as well as estimates of ROLTP and rPerf are available for all the current systems. Which of the following could be used as a first approximation of total performance required for one large server?()
第10题:
A financial customer has three data centers that are four kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds. Which solution satisfies the customer’s recovery time objective()