x445 with four Xeon DP processors and 16GB of memory in a single SMP module
x445 with four Xeon MP processors and 16GB of memory in a single SMP module
x445 with two SMP modules each containing two Xeon DP processors and 8GB of memory
x445 with two SMP modules each containing two Xeon MP processors and 8GB of memory
第1题:
A customer has a requirement for a server to run Windows Server 2003 Enterprise Edition and Exchange 2003 Enterprise Edition. It has been determined that 4GB RAM will be needed. The customer is trying to decide between the two following configurations: (1)An IBM xSeries x366 with 4 Xeon MP processors and 4 x 1GB memory DIMMs. (2)An IBM xSeries x445 with 4 Xeon MP processors and 8 x 1GB memory DIMMs. Which question should be asked to guide the customer in selecting the correct memory configuration?()
第2题:
A company needs additional storage for a block I/O based database application. The application has low I/O bandwidth requirements across the campus. The customer has a TCP/IP infrastructure and is interested in low-cost products that are compatible with its environment. Which technology is most appropriate for this customer?()
第3题:
A customer has a p650 with a write-intensive database application. Recently the order entry team has complained about unusually slow response times. There have been no complaints from any other departments. Which of the following actions would most likely address the problem?()
第4题:
A retail customer has a database server that requires more than 64Gb memory and four or more processors sockets. Which of the following system x servers meets this requirements?()
第5题:
A customer needs a new Microsoft Windows 2003 Server. They are running an application that requires substantial memory. They would like a rack mountable system, which will support four Xeon processors with 2MB of L3 cache. Which of the following is the minimum configuration to satisfy the customer’s requirements?()
第6题:
A customer has an 8-way p650 running an application for about 200 users. In the past, the requiredamount of memory and processors has increased proportionally to the number of new users. The customer plans to increase users by 10% each year for the next three years. Next year, a database will be added to the workload to support the users directly rather than being on a separate machine. What is the most likely result of this projected growth?()
第7题:
A company is deploying a Microsoft Windows-based, mission-critical Data Warehousing application. The customer has specified 4GB of RAM. Which TWO of the following questions will best help the consultant determine the proper memory configuration?()
第8题:
A company wants to replace an existing UNIX database server with a new application running on Microsoft SQL Server. Sizing analysis shows that a system with at least eight Xeon MP processors and 24GB RAM will be required for the central database server. Which of the following will meet the requirements at the lowest cost?()
第9题:
A database application is installed on a server. The AIX default filesystem cache is not being re-used by the database. Which of the following should be used to fix this problem?()
第10题:
A p5-570 8-way 32GB system has been proposed to a customer as a new test system with four LPARs. The current applications are certified on AIX 5.2 but not yet on AIX 5.3. The customer wants to understand the advantages and disadvantages of this solution versus a pair of 4-way p5-550s with 16GB each in testing their current applications. Which of the following points should the pSeries technical specialist highlight?()