单选题A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems.  They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems.  What is a key requirement that they need to plan for with the new HMC?()A A des

题目
单选题
A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems.  They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems.  What is a key requirement that they need to plan for with the new HMC?()
A

A desk, as it not rack mountable

B

Ethernet connections to the POWER5 systems

C

Serial connections to the POWER5 systems

D

USB connections for the keyboard and mouse

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()

  • A、An additional switch for the new HMC
  • B、Asynchronous adapters on the new HMC
  • C、The two 570 servers are directly connected to the new HMC
  • D、One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC

正确答案:A

第2题:

Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()

  • A、Free up one HMC and update the software for use with the p5 570
  • B、Connect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMC
  • C、Order a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570
  • D、Backup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software

正确答案:A

第3题:

An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC.Which infrastructure is required for the new HMC?()

A.An additional switch for the new HMC

B.Asynchronous adapters on the new HMC

C.The two 570 servers are directly connected to the new HMC

D.One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC


参考答案:A

第4题:

A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()

  • A、Purchase a second HMC and use this to manage the new servers.
  • B、Connect all of the new servers to the existing private HMC network.
  • C、Configure a second private network on their existing HMC for the new servers.
  • D、Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.

正确答案:B

第5题:

Companycom currently has three p650 servers in their environment and they are implementing a p5 595. The p650 servers are running in an SMP environment, but are connected to a pair of HMCs. In order to follow best practices in the enterprise server environment and maintain HMC connectivity to the p650s, what else will needs to be ordered in addition to the p5 595?()

  • A、Include a new HMC in the order to connect to the p5 595
  • B、Include a pair of new HMCs in the order to connect to the p5 595
  • C、Include a media set for POWER5 HMC in the order to upgrade one of the existing HMC’s to POWER5 capabilities
  • D、Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC to  POWER5 capabilities Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC? To POWER5 capabilities

正确答案:B

第6题:

A customer is interested in purchasing a new IBM System Storage DS8000 solution to consolidateolder ESS and F20 storage systems. What should be done first, prior to final proposaldevelopment?()

  • A、perform a Disk Magic study 
  • B、review eConfig with a technical specialist 
  • C、confirm that the customer has enough ports available in the SAN infrastructure 
  • D、submit configuration to IBM System Storage Interoperability Center for validation

正确答案:A

第7题:

A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()

  • A、All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or later
  • B、The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMC
  • C、They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based  systems connected to the existing one
  • D、The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM

正确答案:A

第8题:

An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()

  • A、An additional switch for the new HMc  
  • B、Asynchronous adapters on the new HMc
  • C、The two 570 servers are directly connected to the new HMc  
  • D、One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc

正确答案:A

第9题:

A customer’s new rack contains 12 x p655 servers.   The customer currently has an HMC with one 128-port async adapter with a rack mounted 16-port RAN. The HMC is already attached to two pSeries p630s.  What upgrades, if any, are needed to the HMC to support the new p655 servers?()

  • A、No upgrades are needed.
  • B、Add another 16-port RAN.
  • C、Add an 8-port async adapter.
  • D、Add an additional 128-port adapter.

正确答案:C

第10题:

ompany.com has recently received a new p5-570 in the data center and wants to connect it to an existing HMC environment where each of the existing POWER5 servers has been assigned a static IP address. Which of the following actions should the technical specialist perform to set the service processor network address for a static IP?()

  • A、Configure the IP address through the first client partition.
  • B、Configure the IP address through the ASMI menus.
  • C、Configure the POWER5 service processor for DHCP from the HMC DHCP server.
  • D、Configure the HMC to use the default IP address on the service processor when acquiring the managed server.

正确答案:B

更多相关问题