第1题:
A customer has requested a proposal for a p5-520 with AIX 5.2 and Sysback. There are no plans to run LPARs or Micro-Partitions on the p5-520 in the near future. The customer has asked the pSeries technical specialist to recommend anything else that may be needed. Which of the following should be recommended in this situation?()
第2题:
A customer has requested the most cost-effective p5 solution allowing for growth. Which of the following should the pSeries technical specialist consider doing when configuring each p5 system using eConfig?()
第3题:
A customer has provided the pSeries technical specialist with details of an HACMP solution that they would like validated. The solution is for two POWER4+ p630 servers directly attached to a FAStT600 storage server as the shared storage. Each system has the following: ? 2 integrated network ports ? 2 fibre channel adapter cards ? 1 power supply and redundant cooling ? HACMP v5.1 In addition to a second power supply, what further requirements, if any, are needed to validate this solution and ensure no single point of failure? ()
第4题:
A company has recently placed an order for a POWER4+ p650 server. Their facilities manager has approached the pSeries technical specialist to gather information on the correct power receptacle for thenew server. They have requested a picture of the power cord plug to show to their electrician. Where would the pSeries technical specialist find the required information?()
第5题:
A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them. Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()
第6题:
A customer is ordering a new p650 server to be placed into an existing OEM 42U 19-inch rack containing only two p630 servers. This is the first p650 in the enterprise. What is the most important question that the pSeries technical specialist should ask the customer before the order is placed?()
第7题:
The pSeries technical specialist has been invited to a briefing on the latest POWER technology as a representative of their team. What should the specialist offer to do upon return from class in order to best prepare the rest of the team for the introduction of the new technology?()
第8题:
A customer has ordered a rack, a p650, two p630s, and two p615s. During a conversation on installation planning, the pSeries technical specialist recognizes that the customer expects the rack to arrive as one unit. However, the specialist knows that the p650 will be racked, but the other systems will arrive separately. In fact, the other systems are CSU (Customer Set Up). Why should the specialist immediately inform the customer that additional racking is the customer’s responsibility?()
第9题:
The pSeries technical specialist is concerned that the installed inventory for a p670 does not match what the customer says is installed. The specialist discovers that the customer has never updated their VPD. Which of the following HMC applications is used to gather the current VPD information?()
第10题:
A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers. The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server. How can the specialist help the customer?()