16fibre ports and 0 mega packs
4fibre ports and 8 mega packs
8fibre ports and 4 mega packs
12fibre ports and 0 mega packs
第1题:
A customer has installed an IBM System Storage DS8700 with 20 TB of storage, 32 GB cache, and 16 Fibre Channel ports. The customer is beginning to experience throughput performance issues since they have added new workloads. The customer asks the storage specialist for guidance.Which of the following actions should be recommended as a first step?()
A. install the Performance Accelerator feature
B. review the DS Storage Manager Major Event Log (MEL)
C. add an expansion frame with additionalFibre Channel ports
D. review the latest TPC for Disk study to identify the source of the performance issue
第2题:
A customer is running Microsoft Windows 2003, Sun Solaris, and IBM AIX with a total capacity of20 TB. This customer needs high availability for e-business applications. The servers are currently connected to two EMC Symmetrix subsystems that are running RAID 1. The customer wants to consolidate all storage into an IBM System Storage DS8700. How many Fibre Channel drive sets are needed to satisfy the total capacity for this customer?()
第3题:
A customer would like to convert their existing IBM System Storage DS8100 to a DS8700 to gain more capacity. During the TDA review the impact on the running production environment during conversion is discussed. Which of the following must be considered?()
A. DS8000 model conversions are generally non-disruptive
B. a model conversion from DS8100 to DS8700 is disruptive
C. the DS8100 base frame needs to be sent back to the factory for upgrade
D. during model conversion the logical configuration can be kept, but the system must be rebooted
第4题:
While installing a new IBM System Storage DS5100 into a customer’s data center, it is discoveredthat the customer does not have enough available Fibre Channel ports on their switches. Which ofthe following should have been used to avoid this situation?()
第5题:
A customer has an existing IBM System Storage DS8700 2-way model with 8 mega packs of 300 GB disks and 16 fibre ports. How many additional fibre ports and mega packs can be installed in the base frame()
第6题:
A customer has provided the pSeries technical specialist with details of an HACMP solution that they would like validated. The solution is for two POWER4+ p630 servers directly attached to a FAStT600 storage server as the shared storage. Each system has the following: ? 2 integrated network ports ? 2 fibre channel adapter cards ? 1 power supply and redundant cooling ? HACMP v5.1 In addition to a second power supply, what further requirements, if any, are needed to validate this solution and ensure no single point of failure? ()
第7题:
The Business Partner technical specialist is called to determine if the addition of host ports on an IBM System Storage DS8700 has improved users’ response times for an IBM System p server running SAP. How can the improvement be verified()
第8题:
A customer is running Microsoft Windows 2003, Sun Solaris, and IBM AIX with a total capacity of20 TB. This customer needs high availability for e-business applications. The servers are currently connected to two EMC Symmetrix subsystems that are running RAID 1. The customer wants to consolidate all storage into an IBM System Storage DS8700.How many Fibre Channel drive sets are needed to satisfy the total capacity for this customer?()
A. 8 drive sets of 300 GB drives
B. 4 drive sets of 300 GB drives
C. 14 drive sets of 146 GB drives
D. 18 drive sets of 146 GB drives
第9题:
A customer has installed an IBM System Storage DS8700 with 20 TB of storage, two-way processor version, 32 GB cache, and 16 Fibre Channel ports. The customer is beginning to experience throughput performance issues. To address this performance consideration with minimal cost to the customer, which of the following should be the FIRST step to resolve the problem()
第10题:
A customer has installed an IBM System Storage DS8700 with 20 TB of storage, 32 GB cache, and 16 Fibre Channel ports. The customer is beginning to experience throughput performance issues since they have added new workloads. The customer asks the storage specialist for guidance. Which of the following actions should be recommended as a first step?()