0
1
255
256
第1题:
On a Hardware Management Console (HMC) at version 7, an administrator has an LPAR defined with a minimum of 4GB of memory, 6GB desired and a maximum of 16 GB of memory. The administrator wants to go from 5 GB to 8 GB assigned memory for this partition. In order to make the change, what value should the administrator enter into the add processor resources window? ()
第2题:
A System p customer is planning to implement virtualization and is concerned about how to respond to an increased workload and what limitations there are for very small workloads. Which of the following describes the minimum size for an LPAR and the minimum amount that can be transferred from on LPAR to another()
第3题:
A.Dynamic LPARs
B.LPAR profiles
C.Live Partition Configurability
D.Multiple shared processor pools
第4题:
After making changes to the profile for an LPAR, the administrator asks the operator to bring the LPAR back up into a running state with the new changes. Which of the following is the correct way to do this?()
第5题:
On a Hardware Management Console (HMC) at version 7, an administrator has an LPAR defined with a minimum of 0.1 processors and a maximum of 4 processors. The administrator wants to go from 1 processing unit to 3 processing units for this partition. In order to make the change, what value should the administrator enter into the add processor resources window? ()
第6题:
Which command should the administrator use to display the IPL progress/LED code of the partition?()
第7题:
Which PowerVM feature will allow LPARs to be configured with different configurations of resources?()
第8题:
An administrator is creating a new LPAR with 6 virtual processors and 4 processing units. This LPAR must have the highest priority in the shared processor pool. Which weight should be assigned to this LPAR?()
第9题:
An administrator is creating a new logical partition (LPAR) with 6 virtual processors and 4 processing units. This LPAR must have the highest priority in the shared processor pool. Which weight should be assigned to this LPAR?()
第10题:
A POWER6 595 LPAR has two dedicated processors. The LPAR is active and running AIX 6.1. What must be done to donate any unusedprocessing capacity to the shared processor pool?()