An HMC is required for dual VIO servers.
Dual VIO servers require a split backplane.
A dual VIO enablement code must be entered from the ASMI interface.
The second VIO server must be created using the IVM command line interface.
第1题:
A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down. Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?()
第2题:
What restrictions apply to using virtual Ethernet within a cluster containing VIO clients?()
第3题:
A customer needs to create a number of LPARs on a new POWER6 server with some LPARs requiring a dedicated network and other LPARs utilizing Virtual Ethernet via a VIO server.Which limitation must be considered when planning the system configuration?()
A.A VIO server requires a dedicated LHEA port.
B.There is a limit of 32 LPARs per virtual LAN.
C.Two VIO servers will be required. A single VIO server can only provide virtual storage or virtual Ethernet.
D.Two VIO servers will be required. One to provide virtual networking and another to provide dedicated networking.
第4题:
A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down. Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?()
第5题:
Which of the following is a situation where dual (redundant) HMCs are recommended()?
第6题:
A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system. How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()
第7题:
A proposed server architecture includes SAN LUNs being presented to client LPARs using shared HBAs to reduce infrastructure cost. The customer requires minimal management efforts for the dual VIO Servers. Which technology is recommended for this proposal?()
第8题:
A.When managing more than four VIO servers.
B.When installed with Power 570 and larger hardware.
C.When hosting both Linux and AIX on the same physical hardware.
D.When unexpected outage on a single HMC would prove an untenable risk for the hosted LPARs.
第9题:
A customer has several single partition POWER5 and POWER6 processor-based systems housed in regional data centers and wants to consolidate into a single Power 770. They must minimize overall cost and the number of adapters, while ensuring a reliable infrastructure. Which solution addresses the customer requirements?()
第10题:
A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()