Configure 2 CFFh combination fibre channel / gigabit Ethernet adapters
Configure 1 CFFh 2-port fibre channel adapter and 1 CIOv 2-port gigabit Ethernet adapter
Configure 1 CIOv 2-port fibre channel adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapter
Configure 1 CIOv 2-port gigabit Ethernet adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapter
第1题:
Which of the following describes the advantage of using Fibre Channel over Ethernet (FCoE) in POWER6 and POWER7 Blades?()
第2题:
Your customer has converted from traditional servers to BladeCenter technology and has a requirement for an RSA adapter on a new BladeCenter server. Which of the following options would you use? ()
第3题:
A manufacturing customer has an IBM BladeCenter H chassis with four, HX5 with MAX5 4-socket blades installed. Each blade has the optional Fibre Channel Expansion card. The customer wants redundancy and is going to install the following configuration: (1)two Brocade 20-Port SAN Switch Modules (2)two Nortel Networks 1/10 GB Uplink ESM (3)a redundant AMM What is the minimum number of power supplies needed for this configuration to have full redundancy?()
第4题:
A customer wants to boot from an iSCSI SAN with their IBM BladeCenter infrastructure running Microsoft Windows Server 2000. What is required for the customer to be able to perform this?()
第5题:
A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch. Which of the following should be mentioned to the customer regarding the NPIV switch?()
第6题:
A customer wants to boot from SAN with their IBM BladeCenter infrastructure. What is required for the customer to be able to perform this? ()
第7题:
A customer has a requirement to eliminate single points of failure for an application. They have allocated one Ethernet adapter to each VIO server on the system. Which features of PowerVM and AIX will support the customer requirement?()
第8题:
A customer uses an IBM xSeries x366 for their network server.They experienced downtime when the NIC failed earlier this year.Their Novell 6.5 server needs to be accessible all the time at the highest speed possible.Slots are available where network adapters can still be added. High availability is the primary requirement, but increased network bandwidth on the server is also required. Which of the following is the most cost-effective solution to satisfy all of the customer’s requirements?()
第9题:
A BladeCenter H customer is asking for concurrent Keyboard/Video/Mouse. Select the items required to accomplish this. ()
第10题:
A customer is evaluating using the PCIe SSD adapter for the system boot in their new Power 750. Redundancy and hot-swap capability are required. What configuration supports the customer requirements?()