The most crucial time for project risk assessment is (75) .A.when a problem surfaces

题目
The most crucial time for project risk assessment is (75) .A.when a problem surfacesSXB

The most crucial time for project risk assessment is (75) .

A.when a problem surfaces

B.during the planning phase

C.during the close-out phase

D.after the project schedule has been published

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Which order of steps is followed in carrying out the project?

A. Assessment-Prototype-Design-Construction.

B. Assessment-Design-Prototype-Construction.

C. Design-Assessment-Prototype-Construction.

D. Design-Prototype-Assessment-Construction.


正确答案:D

第2题:

Project (75).Management:includes the processes required to ensure that the project includes au the word required, and only the work required, to complete the project successfully.

A.Integration

B.Configuration

C.Scope

D.Requirement


正确答案:C

第3题:

3 Project tradeoffs are usually made by comparing _____ and constraints.

A. Time, cost, and quality

B. Time, risk, and quality

C. Risk, quality, and manpower availability

D. Cost, quality, and technical performance

E. Cost, quality, and risk


正确答案:D

第4题:

在实际的工作计划制定过程中,主要采用三种方法:“基于项目(Project-based)”,“基于流程(Process-based)”和基于时间(Time-based)。


以上都是

第5题:

The most urgent problem any economic system faces is how to use its scarce resources.

A:puzzling
B:difficult
C:terrifying
D:crucial

答案:D
解析:
urgent“紧急的”和crucial“至关紧要的”含义最接近。该句句意是:任何经济体系所面临的最至关紧要的问题是如何使用它稀少的资源o puzzling"(使)迷惑的、(使)为难的”;difficult“困难的”;terrifying"(使)感到恐怖的”。

第6题:

Most(75)measures involve data encryption and password.

A.security

B.hardware

C.display

D.program


正确答案:A
解析:安全措施大多包括数据加密与口令。

第7题:

● Most (75) measures involve data encryption and password.

(75)

A. security

B. hardware

C. display

D. program


正确答案:A

第8题:

85 Project tradeoffs are usually made by comparing _____ and constraints.

A. Time, cost, and quality

B. Time, risk, and quality

C. Risk, quality, and manpower availability

D. Cost, quality, and technical performance

E. Cost, quality, and risk


正确答案:D

第9题:

crucial关键的,cruise巡航,不是同根词,crucial的词根是-cruc-,cruise的词根是-cru-。


错误

第10题:

9、crucial关键的,cruise巡航,不是同根词,crucial的词根是-cruc-,cruise的词根是-cru-。


错误