is one of the quality planning outputs. A.Scope base line B.Cost ofquality C.Product

题目

is one of the quality planning outputs. A.Scope base line B.Cost ofquality C.Product specification D.Quality checklist

参考答案和解析
正确答案:D
质量检查表(QualityChecklist)是制定项目质量管理计划过程的成果之一。
表6-6给出了本份上午试卷问题1~问题75的参考答案,供读者练习时参考,以便查缺补漏。读者可按每空1分的评分标准得出测试分数,从而大致评估自己对这些知识点的掌握程度。
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

123 Which of the following constitute Juran's "quality trilogy":

A. planning, inspection, control.

B. planning, improvement, control.

C. planning, organization, control.

D. product, price, customer.

E. design, build, deliver.


正确答案:B

第2题:

3 Project tradeoffs are usually made by comparing _____ and constraints.

A. Time, cost, and quality

B. Time, risk, and quality

C. Risk, quality, and manpower availability

D. Cost, quality, and technical performance

E. Cost, quality, and risk


正确答案:D

第3题:

Project tradeoffs are usually made by comparing _____ and constraints.

ATime, cost, and quality

BTime, risk, and quality

CRisk, quality, and manpower availability

DCost, quality, and technical performance

ECost, quality, and risk


正确答案:D

 

第4题:

以下哪种方式是在OLT上查看ONU的线路情况()

A.displaystatisticsont-line-quality00

B.displaystatisticsont00

C.displayontinfo00

D.displayontline-quality00


参考答案:A

第5题:

● Project tradeoffs are usually made by comparing _____ and constraints.

A Time, cost, and quality

B Time, risk, and quality

C Risk, quality, and manpower availability

D Cost, quality, and technical performance

E Cost, quality, and risk


正确答案:D

第6题:

5 Which of the following constitute Juran's "quality trilogy":

A. planning, inspection, control.

B. planning, improvement, control.

C. planning, organization, control.

D. product, price, customer.

E. design, build, deliver.


正确答案:B

第7题:

85 Project tradeoffs are usually made by comparing _____ and constraints.

A. Time, cost, and quality

B. Time, risk, and quality

C. Risk, quality, and manpower availability

D. Cost, quality, and technical performance

E. Cost, quality, and risk


正确答案:D

第8题:

Which of the following constitute Juran's "quality trilogy":

A . planning, inspection, control.

B . planning, improvement, control.

C . planning, organization, control.

D . product, price, customer.

E . design, build, deliver.


正确答案:B

第9题:

[A] spending

[B] planning

[C] financing

[D] saving


正确答案:A
31.A【精析】spending开支;plamung规划过程;financing融资;saving 节省。此处表示的是两种电站的运转都需要大的花销,故选A。

第10题:

汉译英:“数量;质量”,正确的翻译为( )。
A. quality ; quarantine B. quantity ; quarantine
C. quality ; quantity D. quantity ; quality


答案:D
解析: