The advantages of pair and group work include all of the following EXCEPT ( ).

题目
The advantages of pair and group work include all of the following EXCEPT ( ).

A.interaction with peers
B.variety and dynamism
C.an increase in language practice
D.opportunities to guarantee accuracy
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Group brainstorming encourages all of the following except:

A Team building

B Uninhibited verbalization

C Decision making

D Analysis of alternatives

E Convergent thinking


正确答案:E

第2题:

90 Management plans include all of the following except:

A. Organization of project.

B. Job descriptions.

C. Policies and procedures.

D. Linear responsibility charts.

E. Scope baseline.


正确答案:E

第3题:

Management plans include all of the following except:

A.Organization of project.

B.Job descriptions.

C.Policies and procedures.

D.Linear responsibility charts.

E.Scope baseline.


正确答案:E

 

第4题:

95 A Project Status Report would include all of the following except:

A. Cost and schedule reports

B. Changes to scope. cost or schedule

C. Narrative explanation of variances

D. Personnel problems on the project

E. Upcoming activities


正确答案:D

第5题:

68 Group brainstorming encourages all of the following except:

A. Team building

B. Uninhibited verbalization

C. Decision making

D. Analysis of alternatives

E. Convergent thinking


正确答案:E

第6题:

A scientist is informing techs. about a new product which is starting and the type of work that the lab techs. will be expected to do. The barriers which could hinder the lab techs. ability to filter the information include all of the following except:

A language and semantics

B culture and ethics

C intelligence and knowledge base

D reputation, authority, organizational status and position

E relative location of the lab to the scientist's office


正确答案:E

第7题:

162 A scientist is informing techs. about a new product which is starting and the type of work that the lab techs. will be expected to do. The barriers which could hinder the lab techs. ability to filter the information include all of the following except:

A. language and semantics

B. culture and ethics

C. intelligence and knowledge base

D. reputation, authority, organizational status and position

E. relative location of the lab to the scientist's office


正确答案:E

第8题:

A Project Status Report would include all of the following except:

A Cost and schedule reports

B Changes to scope. cost or schedule

C Narrative explanation of variances

D Personnel problems on the project

E Upcoming activities


正确答案:D

第9题:

115 Typical characteristics of a work package include:

A. Representation of units of work at a level where work is performed

B. Clearly distinguishes one work package from all others assigned to a single functional group C. Limits the work to be performed to relatively short periods of time

D. All of the above

E. A and B only


正确答案:E

第10题:

● Management plans include all of the following except:

A Organization of project.

B Job descriptions.

C Policies and procedures.

D Linear responsibility charts.

E Scope baseline.


正确答案:E