Cribbing is ______.A.wooden blocks or dunnage placed between a deck load and the deckB.the

题目

Cribbing is ______.

A.wooden blocks or dunnage placed between a deck load and the deck

B.the chains and shackles used to secure a deck cargo

C.a crate in which a deck cargo is packaged

D.cardboard separation pieces placed between deck loads to prevent chafing

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

When stowing hazardous materials on deck,lashing of such cargo is permitted if ______.

A.A wooden bin is constructed of at least 2-inch dunnage and bolted together

B.The cargo is lashed to the adjacent guard rails

C.The lashings are secured to deck pad eyes

D.There is at least 3 inches of dunnage on deck


正确答案:C

第2题:

Pollution regulations require that each scupper in an enclosed deck area have a ______.

A.Wooden plug

B.Soft rubber plug

C.Two-piece soft patch

D.Mechanical means of closing


正确答案:D

第3题:

________ are to be used for dunnage if you load rice.

A.Wooden planks

B.Rush mats

C.Steel bars

D.Wooden planks and rush mats


正确答案:D

第4题:

材料:

An aircraft lift on board RFA Argus was loaded beyond its safe working load of 18.4 tonnes.There were no injuries to any personnel,or material damage to the ship or its equipment.

During a planned stay in port,500 compressed CO2 cylinders were required to be landed.These were normally stowed on a lower deck and needed to be transferred to the weather deck before being taken ashore.Before the vessel&39;s arrival in port,the planned operation was discussed between various officers and senior ratings,one of whom was to supervise final discharge of the cylinders from the ship.

Once in port,a senior rating gave instructions to three juniors to transfer a number of cylinders to the weather deck.He then left them alone to load the cylinders onto the platform. of an aircraft lift.The cylinders weighed 19.95 tonnes,which was greater than they had been instructed to load.In addition to this excess weight they added a fork lift truck weighing 5.5 tonnes.The lift was then raised.

When it reached the weather deck,the lift was unable to stow at the correct level.When investigated it was discovered that the load of both CO2 bottles and the fork lift truck was greater than its safe working load(SWL)and this had prevented the locking cleats at the flight deck(weather deck)engaging.

问题:

The lift was taken out of service for testing and inspection. The safe working load of the aircraft lift is ________ tonnes.

A.18.4

B.19.95

C.5.5

D.500

The aircraft lift was overloaded by a weight which is ________ more than its SWLA.1.55

B.3.95

C.5.5

D.7.05

It is implied in the passage that ________.A.the lift should be raised slowly to avoid the accident

B.the aircraft lift on board RFA Argus should be driven by super power

C.the senior rating should give instructions in more detail to the three juniors to transfer a number of cylinders to the weather deck

D.if the unloading operation was supervised by an officer who has sufficient experience of the loads,lifting equipment and the overall operation,the accident would had been avoided

It was the ________ that had prevented the locking cleats at the flight deck(weather deck)engaging.A.fork lift

B.CO2 bottles

C.overloaded weight

D.the three juniors

请帮忙给出每个问题的正确答案和分析,谢谢!


问题 1 答案解析:A


问题 2 答案解析:D


问题 3 答案解析:D


问题 4 答案解析:C

第5题:

Strongbacks unshipped in an intermediate deck shall not be placed closer than 15.24 cm from ______.

A.the coaming

B.hatch way

C.fore bulkhead

D.aft bulkhead


正确答案:A

第6题:

Buckler plates are ______.

A.Triangular-shaped plates connecting the bull chain to the topping lift

B.Metal plates secured over the tops of the hawsepipes

C.Faired shell plates with curvature in two directions

D.Sheets of dunnage used to prevent heavy cargo from buckling the deck plates


正确答案:B

第7题:

If an electric cargo winch is being used to lift a draft of cargo and the engine room loses all power,which will occur ________.

A.A pawl,forced by a spring mechanism,will engage the teeth of the bull gear and hold the load

B.An electromagnetic brake will hold the load where it is suspended

C.The load will fall rapidly to the deck unless the foot brake is engaged

D.The load will slowly lower to the deck under control of the drag of the winch motor


正确答案:B

第8题:

In the stowage of deck cargo,cribbing is ______.

A.Placed on deck to support the cargo

B.Separation pieces used to keep cylinders upright and steady

C.Shims for stowing baled cargo

D.Nets placed across the hatch opening to keep the cargo from falling in the hatch


正确答案:A

第9题:

A deck beam does NOT ______.

A.act as a beam to support vertical deck loads

B.lessen the longitudinal stiffness of the vessel

C.act as a tie to keep the sides of the ship in place

D.act as a web to prevent plate wrinkling due to twisting action on the vessel


正确答案:B

第10题:

A DECK, SPACE, AREA, ETC, NOT PERMITTED TO BE ENTERED FOR SAFETY REASONS defines ______.

A.Restricted area

B.Closed area

C.Prohibited place

D.Forbidden place


正确答案:A
受限制区域定义:为安全原因而不允许进入的区域,如一处甲板,空间,区域等。

更多相关问题