A customer is deploying a new Junos Pulse Access Control Service and has completed the initial boot configuration as prompted using a serial connection. The customer now wants to complete the rest of the configuration using the admin GUI.Into which port on the Junos Pulse Access Control Service should the customer plug the network cable to enable access to the admin GUI?()
A. the internal interface
B. the external interface
C. the management interface
D. the console interface
第1题:
5 Which of the following constitute Juran's "quality trilogy":
A. planning, inspection, control.
B. planning, improvement, control.
C. planning, organization, control.
D. product, price, customer.
E. design, build, deliver.
第2题:
A. self
B. trust
C. untrust
D. junos-global
第3题:
Which of the following constitute Juran's "quality trilogy":
A . planning, inspection, control.
B . planning, improvement, control.
C . planning, organization, control.
D . product, price, customer.
E . design, build, deliver.
第4题:
A.gkmcfg.ini
B.vrrpD.ini
C.rmcC.ini
D.algcfg.ini
第5题:
语音电话从3G切换到2G使用的是基于下行覆盖的切换。如果RNC没有下发3A的测量控制,那么可能是CN配置的SERVICE.HANDOVER不正确。CN下发的SERVICE.HANDOVER是否符合要求,是在__条信令消息里面查看。
A、RAB、ASSIGNMENTREQUEST
B、RAB、ASSIGNMENTRESPONSE
C、SECURITYMODE、COMPLETE
D、RADIOLINKSETUPREQUEST
第6题:
已知ds1、ds2分别代表两个不同的DataSet对象。其中ds1已包含名为“Customer”的DataTable对象,且该DataTable对象被变量dt_Customer引用。已知dt_Customer表有300条记录,则执行下列语句后,新的数据表new_dt_Customer中包含D_条记录。 DataTablenew_dt_Customer=dt_Customer.Copy();
A.0
B.100
C.200
D.300
第7题:
You have a MAG Series device with IP address 10.0.1.5 and hostname ad .pulse.local acting as an IF-MAP Federation server. The subject name of the device certificate on this server is ad .pulse.local.Which server URL must you configure on the IF-MAP clients communicating with this IF-MAP Federation server?()
A. https://acl.pulse.local/dana-ws/soap/dsifmap
B. http://acl.pulse.local/dana-ws/soap/dsifmap
C. https://acl/dana-ws/soap/dsifmap
D. http://10.0.1.5/dana-ws/soap/dsifmap
第8题:
123 Which of the following constitute Juran's "quality trilogy":
A. planning, inspection, control.
B. planning, improvement, control.
C. planning, organization, control.
D. product, price, customer.
E. design, build, deliver.
第9题:
A.Completed,Deposited,Released,Shipped
B.Completed,Released,Shipped,Deposited
C.Deposited,Released,Shipped,Completed
D.Released,Shipped,Completed,Deposited
E.Released,Shipped,Deposited,Completed
第10题: