第1题:
A. The communication management plan is contained in or is a subsidiary plan of, the project management plan.
B. The communication management plan can be formal or informal, highly detailed or broadly framed, and based on the needs of the project.
C. The communication manamgement plan organize and summarize the information gathered,and present the results of any analysis as comparedthe performance measurement baseline.
D. The communication management plan can include guidelines project status meetings,project team meetings,e-meetines,and e-mail
第2题:
A. Guessing game
B. Information-gap.
C. Story telling
D. Drama performance.
第3题:
A line manager possesses information which the project team needs, but withholds the information. The results in a(n):
A Blindspot
B Facade
C region of influence
D Communication power base
E None of the above
第4题:
What is a shortcoming of Armstrong’s work according to the author?
A. Some ideas are slightly contradictory.
B. There is too much discussion on studying science.
C. The style. is too serious.
D. It lacks new information.
第5题:
Cooling water is circulated through______in some injectors.
A.the nozzle
B.the nozzle tip
C.the internal passages
D.the fuel re-circulated
第6题:
Project()Management is the Knowledge Area that employs the processes required to ensure timely and appropriate generation, collection, distribution, storage, retrieval,and ultimate disposition of project information.() A.Integration B.Time C.Planning D.Communication
第7题:
The communication management plandetermines the information and communications needs of the stakeholders. In thefollowing statements related to communication management plan, (73) is false.
A.The communication management plan is contained in, or is a subsidiary plan of, the project management plan
B.The communication management plan can be formal or informal, highly detailed or broadly framed, and based on the needs of the project
C.The communication management plan organize and summarize the information gathered, and present the results of any analysis as compared to the performance measurement baseline
D.The communication management plan can include guidelines for project status meetings, project team meetings, e-meetings, and e-mails
第8题:
164 A line manager possesses information which the project team needs, but withholds the information. The results in a(n):
A. Blindspot
B. Facade
C. region of influence
D. Communication power base
E. None of the above
第9题:
For data transmission to be successful,sending and receiving devices must follow a set of communication rules for the exchange of information. These rules are known as( ).
A.E-mail B.Intemet C.network D.protocols
第10题: