The work that needs to be accomplished to deliver a product,service,or result with the specified features and functions is called ( ) .

题目
The work that needs to be accomplished to deliver a product,service,or result with the specified features and functions is called ( ) .

A.Scope management
B.IntegrateD.management
C.SOW
D.PMO
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

109 The primary consideration of product management is to know the _____.

A. probability of product's performance with specified parameters

B. ability the product has to perform. its intended function

C. ability of a product to be produced within existing parameters

D. functionality the product will provide over its useful life

E. All of the above


正确答案:D

第2题:

Which of the following statement related to PMO is not correct? (71)

A.The specific form, function, and structure of a PMO are dependent upon the needs of the organization that it supports.

B.One of the key features of a PMO is managing shared resources across all projects administered by the PMO.

C.The PMO focuses on the specified project objectives.

D.The PMO optimizes the use of shared organizational resources across all projects.


正确答案:C

第3题:

The primary consideration of product management is to know the _____.

A . probability of product's performance with specified parameters

B . ability the product has to perform. its intended function

C . ability of a product to be produced within existing parameters

D . functionality the product will provide over its useful life

E . All of the above


正确答案:D

第4题:

with a clear SOW a contractor completes work as specified,but the buyer is not pleased with the result.the contract is considered to be ( )

A.incomplete because the buyer is not pleased

B.incomplete because the specs are incorrect

C.compete because the contractor meets the terms and conditions of the contract

D.complete because the contractor is satisfied


正确答案:C
有一个清晰的工作说明书,且承包商完成了指定工作,但买方不满意结果。合同被认为是(75)。A.未完成,由于买方不高兴B.未完成因为规格是不正确的C.完成了,因为承包商符合合同的条款和条件D.完成了,因为承包商是满意的

第5题:

()is the process of formalizing acceptance of the completed project deliverables. The key benefit of this process is that it brings objectivity to the acceptance process and increases the probability of final product, service,or result acceptance by validating each deliverable。

A、Validate scope

B、Define scope

C、Control scope

D、Collect requirement


正确答案:C

第6题:

193. This product is guaranteed by Philips for a period of one year after the date of purchase against defects due to faulty workmanship or materials. The guarantee covers both parts and labor. Service under guarantee is only provided upon presentation of reasonable evidence (e.g. completed guarantee card or purchase receipts) that the date of the claim is within the guarantee period. The guarantee is not valid if the defect is due to accidental damage (including in transport), misuse or neglect and in case of alterations or repair carried out by unauthorized persons. The guarantee may not apply if the product requires modification or adaptation to enable it to operate in any country other than the country for which it was designed, manufactures, approved and/or authorized or if any damage result from these modifications. Service (during and after guarantee) is available in all countries where this product is officially distributed by Philips. In countries where Philips do not distribute the product, the local Philips Service organization will also provide service although there may be a delay if the appropriate spare parts and technical manuals are not readily available. These statements do not affect your statutory (法定的) rights as a consumer. In the event of difficulty please contact the Philips Information Center in any country (see encloses addresses). [共5题]

(1) Service under guarantee is available when ________.

(A) the purchase date meets with the guarantee period

(B) a purchase receipt within the validity of the guarantee is presented

(C) the product is damaged

(D) repair needs to be carried out

(2) The guarantee is not provided if the defect is the result of ________.

(A) mishandling

(B) moditication for use in other countries

(C) unauthorized alterations

(D) all of the above

(3) What is necessary when one claims for the guarantee?

(A) The damaged part of the machine.

(B) The purchase receipt for the machine.

(C) The technical workbook for the right model.

(D) The official approval of the local Philips Information Center.

(4) As a rule, the guarantee service is ________.

(A) delayed for some time

(B) delayed for some time

(C) given to local consumers

(D) ignored in some countries

(5) What can be inferred from the passage?

(A) Philips Service has a very large network over the world.

(B) A Philips product call be used in all countries in the world.

(C) One will surely need the guarantee service after the purchase of a Philips product.

(D) There is some difficulty contacting the Philips Information Center.


正确答案:B D B C A

第7题:

What quantities of the specified item can you regularly deliver ()short notice?

A、at

B、on

C、in

D、for


参考答案:B

第8题:

27 The primary consideration of product management is to know the _____.

A. probability of product's performance with specified parameters

B ability the product has to perform. its intended function

C. ability of a product to be produced within existing parameters

D. functionality the product will provide over its useful life

E. All of the above


正确答案:D

第9题:

with a clear SOW a contractor completes work as specified,but the buyer is not pleased with the result.the contract is considered to be (75)

A.incomplete because the buyer is not pleased

B.incomplete because the specs are incorrect

C.compete because the contractor meets the terms and conditions of the contract

D.complete because the contractor is satisfied


正确答案:C
有一个清晰的工作说明书,且承包商完成了指定工作,但买方不满意结果。合同被认为是(75)。A.未完成,由于买方不高兴B.未完成因为规格是不正确的C.完成了,因为承包商符合合同的条款和条件D.完成了,因为承包商是满意的

第10题:

The features and functions that characterize a product,service,or result in a project are called( )

A.statement of workB.product scopeC.product qualityD.project scope


正确答案:B

更多相关问题