问题:单选题After upgrading a server motherboard to the latest firmware revision, configuring LAN access in the SSU (System Setup Utility) fails. Which action should be taken FIRST to correct this problem?()Areplace the NICBinstall the latest SSU (System Setup Utility) versionCupgrade the firmware on the NICDassign the NIC a static IRQ in the SSU (System Setup Utility)
查看答案
问题:单选题Which factor has the greatest impact on the estimated per unit labor cost for a project?()A Historical informationB Use of outside vendorsC Change control processesD Human resource skill level requirements
问题:多选题Which three should be documented after upgrading a SCSI RAID controller?()Adisk utilizationBinstallation dateCadapter baselinesDlocation slot of the RAID controllerEstatus of the adapter card installationFRAID controller information (warranty, specifications etc.)
问题:多选题A customer wants to increase the performance of an existing server. They are running a very network intensive application and feel that increasing the bandwidth to the network will fix their problem. They are running two 24-port autosensing 10/100 hubs, tied together with a standard Ethernet crossover cable in port 24. The server is running IPX. After adding a second network card and plugging one card into each hub, they have not seen any performance improvement. Which two are likely reasons why implementing network adapter teaming has not improved performance?()AAdapter teaming is designed to work with switches.BAdapter teaming only functions with gigabit network cards.CAdapter teaming only provides fault tolerance, not additional bandwidth.DAdapter teaming only works with IPX when using switches and network cards with special features that support teaming.
问题:单选题Who is responsible for authorizing closure of the project?()A Project ManagerB StakeholderC CustomerD Executive Sponsor
问题:单选题Which RAID standard combines data striping across drives with mirroring?()ARAID 0+1BRAID 1+5CRAID 3DHybrid RAID 5+
问题:单选题Which throughput does a 33 MHz, 33-bit bus have?()A132 MbpsB256 MbpsC264 MbpsD450 Mbps
问题:单选题Which is the MOST effective method for generating support for your project plan?()A Requiring stakeholders to sign-off on project plan componentsB Requesting input from all stakeholders during the planning processC Providing an open line of communication regarding the projectD Clearly illustrating how the project relates to the company’s objectives
问题:单选题Within Information Technology projects, communications between the project manager and the project team members should take place:()A by written and oral communication.B via a weekly status report.C through the formal chain of command.D with approved template forms.
问题:单选题Which of the following is the functional description of a server connected between two separate IP subnets?()Aserver as a bridgeBserver as a routerCserver as a switchDserver as a data link
问题:单选题Why does a project manager need an executive sponsor?()A To keep the project team focused on its workB To provide behind-the-scenes assistance with organizational commitment and supportC To sign-off on user requirementsD To negotiate contracts with outside vendors
问题:单选题What is the role of the line manager in a project plan?()A Provide resources to a projectB Request requirements changesC Resolve team conflictsD Control the project budget
问题:单选题The last deliverable at the Close Out meeting is:()A source code.B passwords.C lessons learned.D test results.
问题:单选题What is a reason for reviewing the user requirements document with the client?()A To gain the client’s acceptance of the detailed designB To verify mutual understanding of project resourcesC To verify mutual understanding of the detailed project planD To verify mutual understanding of targeted product performanceE To verify mutual understanding of the tests that will be done after the product is completed
问题:单选题The project sponsor wants the project manager to develop and implement Quality Management techniques to ensure a smooth project transition to the deployment phase. What is an appropriate Quality Management technique to implement?()A Evaluate phase exit milestones using sufficiency criteriaB Flexible entry and exit criteria to minimize schedule delaysC Quality measures reported only to the project steering committeeD Many work teams with few members to maximize the number of deliverable hand-offs