Heavy cargo might break ()cargo,

题目

Heavy cargo might break ()cargo, so it can’t be stowed on top of it.

  • A、light
  • B、bulk
  • C、dangerous
  • D、wet
参考答案和解析
正确答案:A
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A Master should file a marine note of protest if ______.

A.cargo was received at ship side which was damaged in land transit

B.longshore labor went on strike in the port causing undue vessel delay

C.portions of his vessel's cargo were illegally impounded in a foreign port

D.the vessel encountered heavy weather which might have caused cargo damage


正确答案:D

第2题:

WCF TB 11 is likely used in ______ cargo survey report.

A.general

B.liquid

C.container

D.heavy


正确答案:B

第3题:

What cargo does a jumbo boom or heavy derrick used for lifting?


正确答案:A jumbo boom or heavy derrick used for lifting heavy cargo.

第4题:

The ()(重吊杆) can lift heavy cargo.

  • A、heavy cargo derrick
  • B、heavy deck
  • C、jumbo boom
  • D、heavy block

正确答案:C

第5题:

TRANSVERSE MOVEMENT OF CARGO,ESPECIALLY BULK,CAUSED BY ROLLING OR A HEAVY LIST defines ______.

A.Shifting cargo

B.Moving cargo

C.Removing cargo

D.Trimming cargo


正确答案:A

第6题:

A Master would be well advised to file a note of protest if ______.

A.Portions of his vessel’s cargo were illegally impounded

B.Longshore labor went on strike in a port causing undue vessel delay

C.Cargo was received at ship side which was damaged in land transit

D.The vessel encountered heavy weather which might have caused bottom damage


正确答案:D

第7题:

On a vessel proceeding from a very cold to a warm climate with a cargo of a nonhygroscopic nature in the holds,which is TRUE ________.

A.Danger of heavy ship sweat exists;constant and vigorous ventilation is required

B.There is danger of heavy cargo sweat if outside air is introduced by ventilation

C.There is little danger of ship's sweat,slight possibility of cargo sweat;moderate ventilation is needed

D.The possibility of any sweat problem,either cargo or ship,is remote


正确答案:B

第8题:

Please kindly arrange for shore workers to do ______ during loading the heavy cargo on deck as soon as possible.

A.the work of using lines and chains to secure the cargo on board

B.the lash work

C.the work of putting dunnage,keeping the cargo in position and not move when the ship is rolling and pitching

D.the lashing work


正确答案:D

第9题:

重吊杆用于吊大的重件。()

  • A、Heavy derrick is used for lifting large heavy cargo.
  • B、Derrick is used for lifting large heavy cargo.
  • C、Heavy derrick is used for lifting dry bulk cargo.
  • D、Derrick is used for lifting dry bulk cargo.

正确答案:A

第10题:

湿货要远离干货。()

  • A、Wet cargo must be kept away from dry cargo.
  • B、Heavy cargo must be kept away from dry cargo.
  • C、Light cargo must be kept away from dry cargo.
  • D、Wet cargo must be kept away from light cargo.

正确答案:A

更多相关问题