Optimize is one of the six phase

题目

Optimize is one of the six phases of the Cisco Lifecycle Services framework. Which of the following in the optimize phase allows you to assess the routing and switching system, as well as recommend actions, including optimizing device configurations, capacity planning, etc.?()

  • A、Security Assessment
  • B、Change Management
  • C、Technology Assessment
  • D、Operations Readiness Assessment
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

● The completion and approval of one or more () characterizes a project phase.()A.deliverables B.products C.projects D.programs


正确答案:A
每个项目阶段都以一个或数个可交付成果的完成为标志。

第2题:

Optimize is one of the six phases of the Cisco Lifecycle Services framework. Which of the following in the optimize phase allows you to assess the routing and switching system, as well as recommend actions, including optimizing device configurations, capacity planning, etc.?()

A. Security Assessment

B. Change Management

C. Technology Assessment

D. Operations Readiness Assessment


参考答案:C

第3题:

● (66) from one phase are usually reviewed for completeness and accuracyand approved before work starts on the next phase.

A.Process

B.Milestone

C.Work D.

Deliverables


正确答案:D

第4题:

What is the correct way to read the decimal "106.16" in English?

A.One hundred and six point one six.
B.One hundred and six point sixteen.
C.One hundred and six points one six.
D.One hundred and six points sixteen.

答案:A
解析:
考查英语中带有小数点的数字的读法,小数点之后的数字要一个一个读出来,之前的数字按照正常规则来读。 例如15.67的读法为:fifteen point six seven s,故选A。

第5题:

● (75) Development is a structured design methodology that proceeds in a sequence from one phase to the next.

(75)

A. Waterfall

B. Phased

C. Prototyping

D. Parallel


正确答案:A

第6题:

There isn't enough room for us, _______ six dogs and one cat.

A、not to say

B、 not tomention

C、let it go

D、let alone


参考答案:D

第7题:

In which service component of the optimize phase would you assess the routing and switching systemand recommend activities such as optimizing device configurations, capacity planning, or traffic analysis? ()

A.ChangeManagement

B.SecurityAssessment

C.OperationsAssessment

D.SecurityAdministration

E.OperationsReadinessAssessment

F.TechnologyAssessment


参考答案:F

第8题:

Development is a structured design methodology that proceeds in a sequence from one phase to the next.

A.Waterfall

B.Phased

C.Prototyping

D.Parallel


正确答案:A
解析:本题含义可表述为,瀑布模型是一种结构化设计方法,是一个阶段接着一个阶段的顺序过程。所以应该选择A。

第9题:

What will be the phase angle relationship of a six-pole, three-phase, rotating field generator?

A.60

B.120

C.180

D.360


正确答案:B

第10题:

Which of the following three service requirements are included in the Cisco UnifiedCommunications optimize phase()

  • A、Business Case Alignment
  • B、Security Assessment
  • C、Incident management
  • D、Operations Readiness Assessment
  • E、Technology Assessment

正确答案:A,B,E

更多相关问题