Optimize is one of the six phases of the Cisco Lifecycle Services framework. Which of the following in the optimize phase allows you to assess the routing and switching system, as well as recommend actions, including optimizing device configurations, capacity planning, etc.?()
第1题:
● The completion and approval of one or more () characterizes a project phase.()A.deliverables B.products C.projects D.programs
第2题:
Optimize is one of the six phases of the Cisco Lifecycle Services framework. Which of the following in the optimize phase allows you to assess the routing and switching system, as well as recommend actions, including optimizing device configurations, capacity planning, etc.?()
A. Security Assessment
B. Change Management
C. Technology Assessment
D. Operations Readiness Assessment
第3题:
● (66) from one phase are usually reviewed for completeness and accuracyand approved before work starts on the next phase.
A.Process
B.Milestone
C.Work D.
Deliverables
第4题:
第5题:
● (75) Development is a structured design methodology that proceeds in a sequence from one phase to the next.
(75)
A. Waterfall
B. Phased
C. Prototyping
D. Parallel
第6题:
There isn't enough room for us, _______ six dogs and one cat.
A、not to say
B、 not tomention
C、let it go
D、let alone
第7题:
In which service component of the optimize phase would you assess the routing and switching systemand recommend activities such as optimizing device configurations, capacity planning, or traffic analysis? ()
A.ChangeManagement
B.SecurityAssessment
C.OperationsAssessment
D.SecurityAdministration
E.OperationsReadinessAssessment
F.TechnologyAssessment
第8题:
Development is a structured design methodology that proceeds in a sequence from one phase to the next.
A.Waterfall
B.Phased
C.Prototyping
D.Parallel
第9题:
What will be the phase angle relationship of a six-pole, three-phase, rotating field generator?
A.60
B.120
C.180
D.360
第10题:
Which of the following three service requirements are included in the Cisco UnifiedCommunications optimize phase()