On some projects, especially on

题目

On some projects, especially ones of smaller scope, activity sequencing, activity resource estimating, activity duration estimating, and()are so tightly linkedthat they are viewed as a single process that can be performed by a person over a relatively short period of time.

  • A、time estimating
  • B、cost estimating
  • C、project planning
  • D、schedule development
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

() this was the truth.

A、To some extension

B、By some extension

C、To some extent

D、By some extent


参考答案:C

第2题:

178 "Fast-tracked" projects awarded and begun before all planning and risk assessment information is complete and available may _____ .

A. be completed in reduced overall time than other projects.

B. be in a higher risk category than other projects.

C. not be compatible with project risk and assessment

D. A and B

E. All of the above


正确答案:D

第3题:

"Fast-tracked" projects awarded and begun before all planning and risk assessment information is complete and available may _____ .

A be completed in reduced overall time than other projects.

B be in a higher risk category than other projects.

C not be compatible with project risk and assessment

D A and B

E All of the above.


正确答案:D

第4题:

he’s a good( )as he is able to initiate and complete projects.

A. elect

B. personnel

C. candidate

D. applicant


参考答案:C

第5题:

● On some projects, especially ones of smaller scope, activity sequencing, activity resource estimating, activity duration estimating, and (70) are so tightly linked that they are viewed as a single process that can be performed by a person over a relatively short period of time.

A.time estimating

B.cost estimating

C.project planning

D.schedule development


正确答案:D

第6题:

170 Project Risk _____ .

A. should not be calculated for small projects.

B. is the probability of each risk event minus the sum of the consequences of potential risk events.

C. is the cumulative effect of uncertain occurrences which will adversely affect project objectives.

D. cannot be quantified for first time projects.

E. B or D


正确答案:C

第7题:

How do you plan to distribute the securities?

A.Some protect actresses, some work outside the cinema

B.Some protect actors and actresses, some guard dressing rooms and others work outside the theatre

C.Some protect actors and actresses, some guide audience and others work outside the theatre

D.Some guard dressing rooms, some protect super stars and others work outside the stadium.


正确答案:B

第8题:

Project Risk _____ .

A should not be calculated for small projects.

B is the probability of each risk event minus the sum of the consequences of potential risk events.

C is the cumulative effect of uncertain occurrences which will adversely affect project objectives.

D cannot be quantified for first time projects.

E B or D


正确答案:C

第9题:

involves comparing actual or planned project practices to those of other projects to generate ideas for improvement and to provide a basis by which to measure performance. These other projects can be within the performing organization or outside of it,and can be within the same or in another application area.

A.Metrics

B.Measurement

C.Benchmarking

D.Baseline


正确答案:C
解析:基准分析涉及到将实际或计划的项目实践与其他项目进行比较,以产生改进的思想并提供一个测量绩效的基准。其他项目可以是执行组织内部的,也可以是外部的,可以是同一个应用领域的,也可以是其他应用领域的。

第10题:

In the conversation Bob and John talk about three projects in total.()

此题为判断题(对,错)。


参考答案:正确