With the IBM System Storage TS3500 Tape Library, what is the maximum number of expansionframes that can be attached to the base frame?()
第1题:
Company.com wishes to use HACMP on two IBM eServer pSeries servers. During the planning session, it was decided to use the native serial ports s1 or s2 for a non-IP heartbeat network. What should be done to ensure the serial network will function with HACMP heartbeats?()
第2题:
IBM公司的域名是()
第3题:
A.WWW.IBM.COM
B.IBM.COM
C.HOME.IBM.COM
D.DNS.IBM.COM
第4题:
Which of the following resources help ensure hardware and software compatibility with IBM System x and BladeCenter servers?()
第5题:
The CIO of a research and technology company recently sent an email outlining his organization’s Information Technology plans for the next 12 to 18 months. He asked for proposals that satisfied the following requirements: --Recommend an Opteron AMD server capable of running as a 3-way but can be upgraded to a 4-way server. --Recommend a four (4) way Intel Dual core 3.5GHz Sever capable of being upgraded to a 16 way server. What servers would you propose?()
第6题:
A healthcare provider has two applications that they need to redundantly protect in a SAN environment. Their patient record application runs on Oracle 11i and consists of many small, randomly accessed files. The database is kept on three clustered Sun servers and currently uses 30 TB of data space. Their imaging application that retains and manages x-rays, consists of Filenet, CommonStore, and TSM running on an IBM Power750 server, and is currently using 65 TB of data space. Which of the following disk solutions meets the customer’s requirement()
第7题:
An IBM Business Partner suggests an IBM System Storage DS8000 to a customer with a SAN that is now configured with an EMC Symmetrix subsystem disk. The customer wants to determine if new HBAs and software upgrades are needed on the servers if the EMC storage is replaced by the DS8000 What document must be carefully read to help address the customer’s concerns()
第8题:
一个大型的企业级客户目前考虑创建新的数据中心,未来准备实施容灾,下面IBM的哪个产品和解决方案应该优先考虑()。
第9题:
A customer currently buys HP ProLiant servers and EMC storage. The customer has encountered various problems getting certain servers to work with their storage. Which of the following arguments can the Sales Specialist present to best position IBM? ()
第10题:
Which of the following resources could be used to obtain the latest IBM DS Storage ManagerUser’s Guide?()