A customer has just purchased an 8-core POWER 570 which has two dual port 1 Gbps  Integrated Virtual Ethernet (IVE) adapters. The customer wants to implement queue pairs (QPs) to take advantage of parallel processing of network traffic to its client logic

题目

A customer has just purchased an 8-core POWER 570 which has two dual port 1 Gbps  Integrated Virtual Ethernet (IVE) adapters. The customer wants to implement queue pairs (QPs) to take advantage of parallel processing of network traffic to its client logical partitions. Assuming that the system is to utilize the IVEs in both CECs,  which configuration will allow a logical partition to utilize the entire eight cores for network traffic processing?()

  • A、 Set Multiple Core Scaling (MCS) value of the port group to 8 and set multiple core parameter of the client Ethernet adapters to yes.
  • B、 Set Multiple Core Scaling (MCS) value of the port group to 4 and set multiple core parameter of the client Ethernet adapters to yes.
  • C、 Set Multiple Core Scaling (MCS) value of one of the physical port groups to 4 and set multiple core parameter of the client Ethernet adapters to yes.
  • D、 Set Multiple Core Scaling (MCS) value of one of the physical port groups to 8 and set the multiple core parameter of the client Ethernet adapters to yes.
参考答案和解析
正确答案:A
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A customer needs a new 4-way p630 with three partitions to support three AIX 5.2 applications.  Each partition requires two of the following:  OS boot drives, fiber adapters, and gigabit Ethernet adapters.  The customer has an HMC with an available serial port.  In addition to the model 6C4, which of the following is required to meet the customer’s requirements?()

  • A、One 7311-D20 drawer
  • B、Two 7311-D20 drawers
  • C、Two 7311-D10 drawers
  • D、One 7311-D10 drawers

正确答案:B

第2题:

A customer is planning to implement a new x445 in their datacenter.Which TWO of the following should the customer prepare prior to the implementation to ensure a trouble free installation?()

  • A、Install the exhaust fan on top of the IBM NetBAY 42 Enterprise rack for extra cooling
  • B、Ensure a 260V power source for the x445 and BladeCenter is available for fully redundant power
  • C、Ensure a 220v power source for the x445 is available for fully redundant power
  • D、Install the new 10GBit Ethernet network to take advantage of the new network switch in the x445.
  • E、Have their Network Operation Staff review and assist connecting the new server to their existing network.

正确答案:C,E

第3题:

Your customer wants to build a network for a financial trading floor that has a requirement formultiple high-value transactions, which are also vital to the customer. What are the two mostcritical requirements?() (Choose two.)

  • A、no single point of failure
  • B、trading database server location
  • C、redundant application servers location
  • D、deterministic response to all failures
  • E、determine which protocol to use

正确答案:A,D

第4题:

A p5 570 customer is currently running AIX 5.3. The customer now wants to add Virtual Ethernet to two of the LPARs. This will enable the application tier can communicate to the database tier without using an external Ethernet card. What is the best way to accomplish this task?()

  • A、Create a VIO server
  • B、Modify the LPAR profiles to add a Virtual Ethernet adapter
  • C、Buy the Advanced Power Virtualization feature and enter a authorization code at the HMC
  • D、Buy the Advanced Power Virtualization feature and enter a authorization code at the service  processor menu

正确答案:B

第5题:

An administrator has a Power 570 in default configuration with a 4 port 1 Gbps Integrated Virtual Ethernet (IVE) adapter. A new application requires that the MCS value for the first port group of the IVE adapter be set to 1.  If this change is made what is the maximum number of logical ports, across both port groups,  that the IVE adapter can provide? ()

  • A、 4
  • B、 16
  • C、 20
  • D、 32

正确答案:C

第6题:

Companycom wants to reduce the number of copper, Ethernet adapters on their 4 way p5 570 running AIX 5.3 used in each of the four LPARs. Companycom has one database LPAR, two application LPARs, and one web LPAR. Only the Web LPAR needs to communicate with the outside world. What is the minimum number of Ethernet adapters that should be provided to ensure redundancy and no single point of failure?()

  • A、One single port Ethernet adapter
  • B、Four dual port Ethernet adapters
  • C、Two single port Ethernet adapters
  • D、Eight single port Ethernet adapters

正确答案:A

第7题:

Companycom will be using Virtual IO Server to share Ethernet adapters. What can be done to prevent network failure of the client if a Virtual IO Server goes down?()

  • A、Create two virtual adapters on the client, each one from a separate Virtual IO Server
  • B、Enable dead gateway detection on the client so that the network traffic can be rerouted
  • C、Have a spare network card on standby in the client in case the Virtual IO Server goes down
  • D、Create an etherchannel adapter on the client using one Virtual Ethernet adapter from two  separate Virtual IO Servers

正确答案:A

第8题:

A customer has provided the pSeries technical specialist with details of an HACMP solution that they would like validated.  The solution is for two POWER4+ p630 servers directly attached to a FAStT600 storage server as the shared storage.  Each system has the following: ? 2 integrated network ports ?   2 fibre channel adapter cards   ? 1 power supply and redundant cooling   ? HACMP v5.1   In addition to a second power supply, what further requirements, if any, are needed to validate this solution and ensure no single point of failure? ()

  • A、One fibre channel switch
  • B、Two fibre channel switches
  • C、Two Ethernet cards
  • D、Nothing

正确答案:B

第9题:

A customer is planning on having a single Virtual I/O Server (VIOS) configuration in a Power 750. They haveselected a 4-port 1Gb Integrated Virtual Ethernet (IVE). There will be no other network cards installed in the system. One IVE logical port will be used in the VIO Server and will be used as the physicalport in a Shared Ethernet Adapter (SEA). What is the maximum number of IVE logical ports available to use inother LPARs?()

  • A、1
  • B、7
  • C、15
  • D、31

正确答案:D

第10题:

A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()

  • A、Two dual-port PCIe adapters
  • B、A four-port PCIe Ethernet adapter
  • C、Four separate PCIe Ethernet adapters
  • D、Two embedded Integrated Virtual Ethernet adapters (IVE)

正确答案:C

更多相关问题