Companycom LPAR that is using a Virtual IO Server needs to be more highly available. How can this be accomplished using APV features?()
第1题:
An administrator is creating a new LPAR with 6 virtual processors and 4 processing units. This LPAR must have the highest priority in the shared processor pool. Which weight should be assigned to this LPAR?()
第2题:
Companycom is installing a p5 595 with AIX 5.3. The DLPAR option for the resources cannot be selected on the HMC menus. However, the daemons are running on both the HMC and LPARs. Which of the following is a prerequisite for DLPAR functionality?()
第3题:
Anadministratorhasinstalled1VIOServerand5clientLPARsona16-corePower570withthefollowingCPUrequirements:VirtualProcessorsProcessingUnitsMinDesiredMaxMinDesiredMaxVIOS11240.11.02.0LPAR14444.04.04.0LPAR22581.05.06.0LPAR31340.10.31.0LPAR43690.53.06.0LPAR51361.03.0.06IftheadministratoractivatestheLPARsintheaboveorder,whatwillbetheresult?()
A.AllLPARswillstartexceptLPAR5.
B.AllLPARswillstartwithdesiredcapacity.
C.AllLPARswillstartbutLPAR5willhaveitsminimumcapacityassigned.
D.AllLPARswillstartbutLPAR5willhavelessthanitsdesiredcapacity.
第4题:
An administrator is creating a new logical partition (LPAR) with 6 virtual processors and 4 processing units. This LPAR must have the highest priority in the shared processor pool. Which weight should be assigned to this LPAR?()
第5题:
Which of the following functions is provided by the LPAR Validation Tool (LVT)?()
第6题:
An administrator has implemented the following LPARs on a Power 570 with 32 GB memory with 512 MB remaining for allocation: LPAR 1 memory : min = 10 GB des = 15 GB max = 24 GB LPAR 2memory : min = 10 GB des = 15 GB max = 24 GB The administrator receives a request to add 2 GB to LPAR 1. The only way to do this is by moving memory from LPAR 2 to LPAR 1. The administrator attempts to move the memory, but the operation fails. The administrator can however allocate 512 MB that is free to LPAR 1 on the 570. What is the most likely cause of this failure when dynamically moving memory?()
第7题:
Companycom is installing a p5 590 with a HMC to manage LPARs. The customer is very concerned about security and wants to restrict network traffic that is not necessary. What is necessary for communication between the LPARs and the HMC?()
第8题:
AsystemadministratorhasbeeninstructedtoattachstorageintheirclientLPARs,inaPower770,withfibre channeladaptersusingN_portIDvirtualization(NPIV).Whichofthefollowingpartitionshastheminimum requirementstoutilizevirtualfibrechannel?()
A.LPAR-Awith1GbFCHBAandSANconnection
B.LPAR-Bwith2GbFCHBAandSANconnection
C.LPAR-Cwith4GbFCHBAandSANconnection
D.LPAR-Dwith8GbFCHBAandSANconnection
第9题:
Companycom is currently using a p690 and has just ordered a p5 590. They prefer to run in full system partition mode, since their application will utilize all the resources in the machine, and they don't want the overhead of an LPAR. What is the best response to the customer about the POWER5 capabilities?()
第10题:
Companycom is considering a large partitioned p5 590 to consolidate several smaller systems in their data center. Due to the complexity of the consolidation, the customer is asking the technical support specialist to give them a report which shows pre order PCI adapter placement and validates them against IBM's recommendations. The concern is that the factory will not install the adapters in the appropriate slots as the customer pre-selected. What IBM tool is available to provide this?()