单选题Companycom has the following: 8 x 1.65GHz CPUs 16GB Memory 4 LPARs LPAR 1: Test/Dev 1 CPU, 2GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 2: QA 1 CPU, 2GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 3: Prod 3 CPUs, 6GB Memory, 1 Fibre Channel HBA, AIX 5.3

题目
单选题
Companycom has the following: 8 x 1.65GHz CPUs 16GB Memory 4 LPARs LPAR 1: Test/Dev 1 CPU, 2GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 2: QA 1 CPU, 2GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 3: Prod 3 CPUs, 6GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 4: Web App 3 CPUs, 6GB Memory, 1 Fibre Channel HBA, SUSE Linux Utilization over a 30 day period LPAR 1: Average utilization was 15%, Peak utilization was 100% LPAR 2: Average utilization was 25%, Peak utilization was 100% LPAR 3: Average utilization was 50%, Peak utilization was 90% LPAR 4: Average utilization was 35%, Peak utilization was 100% If the customer has a requirement for all four LPARs moved to a p5 590 and to have dedicated CPU resources. Which of the following would best describe the profile requirements?()
A

LPARs 1 and 2, SMT on, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT on, min CPU 1.0, max CPU 3.0, desired CPU 2.0 

B

LPARs 1 and 2, SMT on, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT on, min CPU 2.0, max CPU 3.0, desired CPU 3.0 

C

LPARs 1 and 2, SMT on, min CPU 1.0, max CPU 3.0, desired CPU 3.0 LPARs 3 and 4, SMT on, min CPU 1.0, max CPU 3.0, desired CPU 2.0 

D

LPARs 1 and 2, SMT off, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT off, min CPU 1.0, max CPU 3.0, desired CPU 3.0

参考答案和解析
正确答案: D
解析: 暂无解析
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

An administrator has implemented the following LPARs on a Power 570 with 32 GB memory with 512 MB remaining for allocation: LPAR 1 memory : min = 10 GB des = 15 GB max = 24 GB  LPAR 2memory : min = 10 GB des = 15 GB max = 24 GB The administrator receives a request to add 2 GB to LPAR 1. The only way to do this is by moving memory from LPAR 2 to LPAR 1. The administrator attempts to move the memory, but the operation fails. The administrator can  however allocate 512 MB that is free to LPAR 1 on the 570.  What is the most likely cause of this failure when dynamically moving memory?()

  • A、 Maxperm% is set too low on LPAR 2
  • B、 Insufficient paging space on LPAR 1
  • C、 Service IBM.DRM is unavailable on LPAR 1
  • D、 Insufficient pinnable memory frames available on LPAR 2

正确答案:D

第2题:

Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()

  • A、Use AIX 5.3 which supports micro-partitioning for both the test and training LPARS
  • B、Use DLPAR to move resources from the test LPAR to training when training is active
  • C、Install Partition Load Manager to share resources between the test and training environments
  • D、Install Advanced Power Virtualization and then use micro-partitioning for both the test and  training LPARs

正确答案:D

第3题:

An administrator wants to have the flexibility to dynamically move a fibre channel PCI card between given LPARs.For each given LPAR how should they add the PCI card to the LPAR profile?()

A.Add the fibre channel card as hared?Add the fibre channel card as ?hared?

B.Add the fibre channel card as irtual?Add the fibre channel card as ?irtual?

C.Add the fibre channel card as esired?Add the fibre channel card as ?esired?

D.Add the fibre channel card as equired?Add the fibre channel card as ?equired?


参考答案:C

第4题:

Which of the following is a key advantage of AIX v5.3 over AIX v5.2?()

  • A、Dynamic LPAR
  • B、Micro-Partitioning
  • C、Small Memory Real Mode
  • D、Capacity Upgrade on demand for memory

正确答案:B

第5题:

A system administrator has been instructed to attach storage in their client LPARs, in a Power 770, with fibre channel adapters using N_port ID virtualization (NPIV). Which of the following partitions has the minimum requirements to utilize virtual fibre channel?()

  • A、LPAR-A with 1Gb FC HBA and SAN connection
  • B、LPAR-B with 2Gb FC HBA and SAN connection
  • C、LPAR-C with 4Gb FC HBA and SAN connection
  • D、LPAR-D with 8Gb FC HBA and SAN connection

正确答案:B

第6题:

Companycom has the following: 8 x 1.65GHz CPUs 16GB Memory 4 LPARs LPAR 1: Test/Dev 1 CPU, 2GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 2: QA 1 CPU, 2GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 3: Prod 3 CPUs, 6GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 4: Web App 3 CPUs, 6GB Memory, 1 Fibre Channel HBA, SUSE Linux Utilization over a 30 day period LPAR 1: Average utilization was 15%, Peak utilization was 100% LPAR 2: Average utilization was 25%, Peak utilization was 100% LPAR 3: Average utilization was 50%, Peak utilization was 90% LPAR 4: Average utilization was 35%, Peak utilization was 100% If the customer has a requirement for all four LPARs moved to a p5 590 and to have dedicated CPU resources. Which of the following would best describe the profile requirements?()

  • A、LPARs 1 and 2, SMT on, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT on, min CPU 1.0, max CPU 3.0, desired CPU 2.0 
  • B、LPARs 1 and 2, SMT on, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT on, min CPU 2.0, max CPU 3.0, desired CPU 3.0 
  • C、LPARs 1 and 2, SMT on, min CPU 1.0, max CPU 3.0, desired CPU 3.0 LPARs 3 and 4, SMT on, min CPU 1.0, max CPU 3.0, desired CPU 2.0 
  • D、LPARs 1 and 2, SMT off, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT off, min CPU 1.0, max CPU 3.0, desired CPU 3.0

正确答案:B

第7题:

A customer has defined their server needs as a four-LPAR 16-way p570 with 64GB of memory, four 10/100/1000 TX LAN adapters, and six fibre channel adapters to external storage in an IBM ESS (Shark).  They like the idea of being able to do SAN maintenance while not incurring downtime.  If all LPARs are production related and similar, which question is most appropriate for the pSeries technical specialist to ask?()

  • A、Would 10/100 Ethernets work as well?
  • B、Should there be eight fibre channel adapters?
  • C、Should there be an async adapter for heartbeat?
  • D、Will all LPARs need access to a common fibre channel tape drive?

正确答案:B

第8题:

Companycomhasthefollowing:8x1.65GHzCPUs16GBMemory4LPARsLPAR1:Test/Dev1CPU,2GBMemory,1FibreChannelHBA,AIX5.3LPAR2:QA1CPU,2GBMemory,1FibreChannelHBA,AIX5.3LPAR3:Prod3CPUs,6GBMemory,1FibreChannelHBA,AIX5.3LPAR4:WebApp3CPUs,6GBMemory,1FibreChannelHBA,SUSELinuxUtilizationovera30dayperiodLPAR1:Averageutilizationwas15%,Peakutilizationwas100%LPAR2:Averageutilizationwas25%,Peakutilizationwas100%LPAR3:Averageutilizationwas50%,Peakutilizationwas90%LPAR4:Averageutilizationwas35%,Peakutilizationwas100%IfthecustomerhasarequirementforallfourLPARstobemovedtoap5590andassignedtoasharedpool.

Whichofthefollowingwouldbestdescribetheprofilerequirements?()


参考答案:A

第9题:

Which of the following x366 8GB memory configurations will produce the best performance?()

  • A、One memory card with four 2GB DIMMs
  • B、Two memory cards with four 2GB DIMMs
  • C、Two memory cards with eight 1GB DIMMs
  • D、Four memory cards with eight 1GB DIMMs

正确答案:D

第10题:

A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()

  • A、Dual power supplies.
  • B、Twice the amount of disk.
  • C、Two dual-port LHEA adapters.
  • D、Two dual-port fibre channel adapters.

正确答案:A

更多相关问题