While configuring a new adapter

题目

While configuring a new adapter using cfgmgr, an administrator receives a warning message indicating that some device packages are not installed. Additionally, the adapter displays in the Defined state. Which command will resolve the issue and make the adapter available?()

  • A、shutdown -Fr
  • B、cfgmgr -i <lpp_source>
  • C、mkdev -l <device_name>
  • D、mknode /dev/<device_name>
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

It took me a while()the new job.

Ato adapt

Badapt

Cadapting

Dto adapt to


D

第2题:

Which two practices help secure the configuration utilities on wireless access points from unauthorized access? (Choose two.)()

  • A、assigning a private IP address to the AP
  • B、changing the default SSID value
  • C、configuring a new administrator password
  • D、changing the mixed mode setting to single mode
  • E、configuring traffic filtering

正确答案:B,C

第3题:

While configuring a new adapter using cfgmgr, an administrator receives a warning message indicating that some device packages are not installed. Additionally, the adapter displays in the Defined state.Which command will resolve the issue and make the adapter available?()

A.shutdown -Fr

B.cfgmgr -i <lpp_source>

C.mkdev -l <device_name>

D.mknode /dev/<device_name>


参考答案:B

第4题:

A customer is evaluating using the PCIe SSD adapter for the system boot in their new Power 750. Redundancy and hot-swap capability are required. What configuration supports the customer requirements?()

  • A、Configure the PCIe SSD adapter and drive modules as a JBOD
  • B、Configure a pair of mirrored PCIe SSD adapters and drive modules
  • C、Configure the PCIe SSD adapter and drive modules in a RAID-6 array
  • D、Configure the PCIe SSD adapter and drive modules in a RAID-5 array

正确答案:B

第5题:

A pSeries technical specialist is configuring the network adapters for an HACMP cluster.  The plan is to use a four-port Ethernet adapter with IPAT via IP aliasing for the two service IP labels.  Which of the following would be a critical concern with the proposed configuration?()

  • A、A four-port adapter is not supported.
  • B、The four-port adapter is a single point of failure.
  • C、There should be a spare port for each service IP label.
  • D、The four-port adapter could be a potential performance bottleneck.

正确答案:B

第6题:

It took me a while()the new job.

  • A、to adapt
  • B、adapt
  • C、adapting
  • D、to adapt to

正确答案:D

第7题:

Which action increases server availability?()

  • A、 configuring a second network card with a different IP address
  • B、 replacing the existing 100 Mbps NIC with a gigabit Ethernet NIC
  • C、 using adapter teaming and configuring the second network card with the same IP address as the first network card
  • D、 installing a dual-port network card that can handle the future growth and setting one NIC to 10 Mbps and one NIC to 100 Mbps

正确答案:C

第8题:

The idea for the new project came to Jack ______ to his study recently.

A. while devoting

B. while devoting himself

C. while he was devoted

D. while devoted


正确答案:C
答案为 C。当杰克正投入在研究中时,他有了建立新项目的想法。while引导时间状语,逻辑主句与主句主语不一致,因此不能省略。

第9题:

When configuring a dual port gigabit Integrated Virtual Ethernet adapter (IVE), what value must be assigned to Multiple Core Scaling (MCS) to enable 8 logical ports in total? ()

  • A、2
  • B、4
  • C、8
  • D、16

正确答案:A

第10题:

A customer’s new rack contains 12 x p655 servers.   The customer currently has an HMC with one 128-port async adapter with a rack mounted 16-port RAN. The HMC is already attached to two pSeries p630s.  What upgrades, if any, are needed to the HMC to support the new p655 servers?()

  • A、No upgrades are needed.
  • B、Add another 16-port RAN.
  • C、Add an 8-port async adapter.
  • D、Add an additional 128-port adapter.

正确答案:C

更多相关问题