单选题What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()A The new system requires 1 installed processor card for the GX++ bus adapterB The new system requires a min

题目
单选题
What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()
A

The new system requires 1 installed processor card for the GX++ bus adapter

B

The new system requires a minimum of 2 installed processor cards for the GX++ bus adapter

C

The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapter

D

The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand  cluster adapter

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A customer would like to buy a new Power 750 and attach 2 PCIe I/O drawers. What is the minimum configuration which will support this?()

  • A、One processor card and one GX+ expansion card
  • B、Two processor cards and one GX++ expansion card
  • C、One processor card, one GX+ expansion card, and one GX++ expansion card
  • D、Two processor cards, one GX+ expansion card, and one GX++ expansion card

正确答案:C

第2题:

Which of the following is MOST critical when installing a new processor in an existing system?()

  • A、Thermal paste
  • B、Fans
  • C、Drive speeds
  • D、Cable management

正确答案:A

第3题:

Which of the following is MOST critical when installing a new processor in an existing system?()

A. Thermal paste

B. Fans

C. Drive speeds

D. Cable management


参考答案:A

第4题:

A customer is evaluating using the PCIe SSD adapter for the system boot in their new Power 750. Redundancy and hot-swap capability are required. What configuration supports the customer requirements?()

  • A、Configure the PCIe SSD adapter and drive modules as a JBOD
  • B、Configure a pair of mirrored PCIe SSD adapters and drive modules
  • C、Configure the PCIe SSD adapter and drive modules in a RAID-6 array
  • D、Configure the PCIe SSD adapter and drive modules in a RAID-5 array

正确答案:B

第5题:

A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()

  • A、e-Config
  • B、System Planning Tool (SPT)
  • C、IBM Workload Estimator (WLE)
  • D、IBM Performance Monitor (PM)

正确答案:B

第6题:

An HP customer would like to discuss IBM system advantages. Their current system platform is a partitioned HP rp8400. Which of the following pSeries systems and advantages should be discussed?()

  • A、p630. Maximum partitions, maximum storage, I/O bus speed
  • B、p670. Maximum partitions, maximum memory, number of I/O slots
  • C、p655. Maximum number of CPUs, processor speed, number of I/O slots
  • D、p690. Maximum number of CPUs, peak system bandwidth, peak I/O bandwidth

正确答案:B

第7题:

A technician has just installed an upgraded graphics card. The computers power turns off before itfinishes booting. Which of the following is the cause of the problem? ()

  • A、The monitor cannot display the increased resolution that is a feature of the new graphics card.
  • B、The power supply does not provide enough wattage to power the new graphics card.
  • C、The new graphics card is incompatible with the existing processor.
  • D、The computer does not have enough RAM to support the new graphics card.

正确答案:B

第8题:

In the event of a catastrophic disaster, after which you need to replace the entire UCS blade system (that is, new fabric interconnects, new IOMs, new chassis, and new blades), what type of backup would provide the most complete set of information?()

  • A、 logical configuration
  • B、 all configuration
  • C、 full state
  • D、 system configuration

正确答案:C

第9题:

A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()

  • A、 vmstat and iostat data from the older machines 
  • B、 The number of CPUs that were installed in the original machines 
  • C、 Data from Workload Estimator (WLE) and IBM Performance Management (PM) 
  • D、 Performance data that is collected from the new system after it has been put into production

正确答案:C

第10题:

A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()

  • A、Power 710
  • B、Power 720
  • C、Power 730
  • D、Power 740

正确答案:D