Lightening causes a power surge and leads to a fire in the datacenter. Following emergency procedures, which of the following is the FIRST thing the server administrator should do?()A、Turn off all electrical powerB、Remove all backup mediaC、Implement fire 

题目

Lightening causes a power surge and leads to a fire in the datacenter. Following emergency procedures, which of the following is the FIRST thing the server administrator should do?()

  • A、Turn off all electrical power
  • B、Remove all backup media
  • C、Implement fire suppression
  • D、Evacuate all personnel
参考答案和解析
正确答案:D
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

To prevent the spread of fire by conduction, you should ______.

A.cool the bulkheads around the fire

B.remove combustibles from direct exposure

C.close all openings to the area

D.shut off all electric power


正确答案:A

第2题:

Which of the following should the technician do FIRST when replacing a motherboard?()

  • A、Use a benchmarking tool
  • B、Use anti-static wrist band
  • C、Remove the CPU
  • D、Remove the power supply

正确答案:B

第3题:

Which of the following should the technician do FIRST when removing a paper jam?()

A. Open all the doors in the printer.

B. Clear the print queue.

C. Turn the printer off.

D. Take the printer offline.


参考答案:C

第4题:

A datacenter manager would like to ensure that all fire suppression in the datacenter is safe for the equipment in the room. Which of the following classifications should be listed on the fire suppression system?()

  • A、A
  • B、B
  • C、C
  • D、D

正确答案:C

第5题:

An administrator sees that smoke is coming from the UPS. Which of the following should they doFIRST?()

  • A、Use a Class A fire extinguisher.
  • B、Evacuate personnel.
  • C、Install additional fans in the UPS
  • D、Backup the servers.

正确答案:B

第6题:

A technician at a small business goes into the server room to perform maintenance on a server and notices it is very hot and audible alarms are going off. The technician is unsure of how to remedy the situation. Which of the following should the technician do?()

  • A、Turn off all the equipment in the server closet
  • B、Install a fan in the server closet
  • C、Turn off the power to the server closet
  • D、Follow escalation procedures for emergencies

正确答案:D

第7题:

A technician has installed a new motherboard in a workstation, but after hardware tests, themotherboard has failed. Which of the following should the technician do FIRST before replacingthe motherboard? ()

  • A、Reseat all power connections.
  • B、Remove the CMOS battery.
  • C、Install the graphics card.
  • D、Ground to the case.

正确答案:D

第8题:

which of the following actions will you not take before beginning installation or removal of anyNON-PNP hardware device inside the computer case?()

A. Place all the hardware components in static proof bags.

B. Remove all the jumpers from the motherboard.

C. Switch off the main power and remove the power cord

D. Use an anti-static wrist strap.

E. Turn off the computer.

F. Place the computer on the anti-static mat


参考答案:B

第9题:

which of the following actions will you not take before beginning installation or removal of anyNON-PNP hardware device inside the computer case?()

  • A、Place all the hardware components in static proof bags.
  • B、Remove all the jumpers from the motherboard.
  • C、Switch off the main power and remove the power cord
  • D、Use an anti-static wrist strap.
  • E、Turn off the computer.
  • F、Place the computer on the anti-static mat

正确答案:B

第10题:

A Windows server’s backup jobs keep failing with an error message stating that the source drive is not available. After reviewing the logs, which of the following should a technician do FIRST to troubleshoot this issue?()

  • A、Verify the backup media has enough storage space for the backup job
  • B、Verify the volume shadow copy service is running
  • C、Close all terminal services sessions on the server
  • D、Reboot the Windows server and re-run the backup job

正确答案:B