A network administrator needs to add an additional connection to a room. The administrator adds a new Ethernet switch and must connect it to an existing switch. Which cable type should be used to connect the two switches?()A、CAT3 cableB、Serial cableC、Cros

题目

A network administrator needs to add an additional connection to a room. The administrator adds a new Ethernet switch and must connect it to an existing switch. Which cable type should be used to connect the two switches?()

  • A、CAT3 cable
  • B、Serial cable
  • C、Crossover cable
  • D、Rollover cable
参考答案和解析
正确答案:C
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

What kind of cable should be used to establish a trunked line between two Catalyst switches?

A.A straight-through cable

B.An EIA/TIA-232 serial cable

C.An auxiliary cable

D.A modem cable

E.A cross-over cable


正确答案:E
解析:Explanation: A crossover cable is used to connect two of the same device types, or devices from the same OSI layer.

第2题:

An administrator is having a hard time adding a new switch to the network. After verifying that allthe ports are configured correctly on each switch, which of the following should the administratorverily NEXT?()

A. Straight-through cable is used to connect both switches

B. Loopback plug is connected

C. Crossover cable is used to connect both switches

D. Cable is a rollover cable


参考答案:C

第3题:

A new switch is being installed in the Ezonexam network and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that VLAN information can be passed between the switches. Which of the following must you do to accomplish this? (Choose all that apply).

A.You must set each end of the trunk line to IEEE 802.1e encapsulation.

B.You must set the same VTP management domain name on both switches.

C.You must set all ports on the two switches as access ports.

D.You must configure one of the switches as a VTP server.

E.You must use a rollover cable to connect the two switches.


正确答案:BD
解析:Explanation:ThefollowingdescribeswhatisneededinordertocorrectlysetupVTP:IncorrectAnswers:A.TheencapsulationcanbeeitherISLor802.1Q,andneedtomatchateachendofthetrunk.C.PortsmustonlybeassignedtoVLANS.Oncethatisdoneandthetrunkisupandrunning,theVLANinformationwillbepassedbetweentheswitches.E.AregularCAT5cableisusedtoconnecttheswitches,assuming10/100Ethernetisused.

第4题:

A new switch is being installed and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that VLAN information can be passed between the switches.Which of the following must you do to accomplish this?()

A. You must set each end of the trunk line to IEEE 802.1e encapsulation.

B. You must set the same VTP management domain name on both switches.

C. You must set all ports on the two switches as access ports.

D. You must configure one of the switches as a VTP server.

E. You must use a rollover cable to connect the two switches.


参考答案:B, D

第5题:

At a branch location, TestKing.com has deployed a non modular router that is equipped with two serial interfaces and two Ethernet interfaces.What additional equipment must be used to allow the branch office to connect to the central office by using an ISDN service?()

A. a serial cable with a V.35 to RJ45 adapter

B. a CSU/DSU

C. an external ISDN TA and NT1

D. The non-modular router cannot connect to an ISDN service. The network administrator must purchase a modular router with an ISDN BRI-U card.


参考答案:C

第6题:

Which of the following should be used to test an internal NIC without having to connect it to thenetwork?()

A. Loopback cable

B. Crossover cable

C. Rollover cable

D. Straight cable


参考答案:A

第7题:

An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC.Which infrastructure is required for the new HMC?()

A.An additional switch for the new HMC

B.Asynchronous adapters on the new HMC

C.The two 570 servers are directly connected to the new HMC

D.One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC


参考答案:A

第8题:

Which type of cable should be used to make a connection between the Fa0/0 port on a router and the Fa0/0 port switch?

A.Rollover cable

B.Console cable

C.Crossover cable

D.Straight-through cable

E.Serial cable


正确答案:D
解析:Explanation:Straight-throughcablesareusedtoconnecthosttoswitch(orhub)androutertoswitch(orhub).

第9题:

What kind of cable should be used to establish a trunked line between two Catalyst 2950 switches?()

A. a straight-through cable

B. an EIA/TIA-232 serial cable

C. an auxiliary cable

D. a modem cable

E. a cross-over cable


参考答案:E

第10题:

Two buildings on the San Jose campus of a small company must be connected to use Ethernet with a bandwidth of at least 100 Mbps. The company is concerned about possible problems from voltage potential differences between the two buildings. Which media type should be used for the connection()。

A.UTP cable

B.STP cable

C.coaxial cable

D.fiber optic cable


参考答案:D

更多相关问题