翻译:DTA definite time of arrival

题目

翻译:DTA definite time of arrival

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

The insurance shall be ()from the time of the engineer’s departure from China up to the time of his arrival in China on return.

A、effective

B、effecting

C、effect

D、effected


参考答案:D

第2题:

Jitter is an unwanted variation of one or more characteristics of a periodic signal in electronics and telecommunications and()refers to call issues that cause variations in timing or time of arrival.

A.echo

B.jitter

C.packet loss

D.digitized sampling


参考答案:B

第3题:

A program is characterized as:

A.a grouping or related tasks lasting one year or less.

B.a unique undertaking having a definite time period.

C.a grouping of similar projects having no definite end that supports the product(s) from cradle to grave.

D.a project with a cost over $ million.

E.None of the above.


正确答案:C
C

第4题:

汉译英:“装货港;到达日期”,正确的翻译为:()
A.Port of loading ; Date of departure
B.Port of discharge ; Date of departure
C.Port of loading ; Date of arrival
D.Port of discharge ; Date of arrival


答案:C
解析:

第5题:

Where a charter-party specifies the estimated time of arrival of a vessel at the port of loading, there is ________ on the shipowners to sail to there on the date on which when proceeding with all convenient speed it would normally reach the port on or about the estimated date of arrival.

A.a necessary right

B.an absolute observation

C.an absolute obligation

D.a possible solution


正确答案:C

第6题:

“ESTIMATED ARRIVAL TIME”的中文是“实际到达时间”。

此题为判断题(对,错)。


正确答案:×

第7题:

On a voyage charter party when the vessel is in port the charter will specify a definite period of time for loading or discharging of cargo by the Charterer.This time is called ________ .

A.Demurrage

B.Dispatch

C.Days of readiness

D.Laydays


正确答案:D

第8题:

200 A program is characterized as:

A. a grouping or related tasks lasting one year or less.

B. a unique undertaking having a definite time period.

C. a grouping of similar projects having no definite end that supports the product(s) from cradle to grave. D. a project with a cost over $1 million.

E. None of the above


正确答案:C

第9题:

汉译英:“装货地;卸货地”,正确的翻译为( )。
A. place of loading; place of discharge
B. place of destination; place of discharge
C. place of arrival; place of loading
D. place of arrival ; place of shipment


答案:A
解析:

第10题:

汉译英:“装货港;到达日期”,正确的翻译为:( )。
A. Port of loading ; Date of departure B. Port of discharge ; Date of departure
C. Port of loading ; Date of arrival D. Port of discharge ; Date of arrival


答案:C
解析:

更多相关问题