关于最可能时间(MOST LIKELY TIME),下列说法正确

题目

关于最可能时间(MOST LIKELY TIME),下列说法正确的是()

  • A、任何事情都顺利的情况,完成某项工作的时间
  • B、正常情况下,完成某项工作的时间
  • C、最不利的情况,完成某项工作的时间
  • D、随机出现的时间
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Which three tasks can be automatically performed by the Automatic Data Optimization feature ofInformation lifecycle Management (ILM)?()

A. Tracking the most recent read time for a table segment in a user tablespace

B. Tracking the most recent write time for a table segment in a user tablespace

C. Tracking insert time by row for table rows

D. Tracking the most recent write time for a table block

E. Tracking the most recent read time for a table segment in the SYSAUX tablespace

F. Tracking the most recent write time for a table segment in the SYSAUX tablespace


参考答案:A, B, C

第2题:

Computers on a small network are not able to receive new addresses from the DHCP server. However, the administrator has checked the server and ensured it is connected, responding, and functional. Which of the following is the MOST likely problem in this scenario?()

  • A、The DHCP server has an incorrect gateway configured.
  • B、The DHCP server was incorrectly configured with a six hour lease time on addresses.
  • C、The DHCP server was incorrectly configured with no-expiring lease time on addresses.
  • D、The DNS server is no longer functional and internal name-address resolution is down.

正确答案:C

第3题:

A line manager provides you with three estimates for his activity in your PERT network. His estimates are 2 weeks optimistically, 4 weeks most likely, and 12 weeks pessimistically. The expected time which would appear on the chart would be:

A . 4 weeks

B . 5 weeks

C . 6 weeks

D . 7 weeks

E . None of the above.


正确答案:B

第4题:

A user states they receive a message Boot device not found half of the time they boot their system.Which of the following is the MOST likely cause? ()

  • A、A dead CMOS battery
  • B、The OS is not installed on the hard drive
  • C、A faulty RAM
  • D、A faulty HDD connection

正确答案:D

第5题:

在PERT对各个项目活动的完成时间的估计中,most likely time是()

  • A、乐观时间
  • B、最可能时间
  • C、悲观时间
  • D、估计时间

正确答案:B

第6题:

A user reports it takes a long time to load all applications and the hard drive LED is showing constant activity. Which of the following is MOST likely the issue?()

A. The processor is faulty.

B. The file system is fragmented.

C. The modem drivers are corrupt.

D. The power supply is faulty.


参考答案:B

第7题:

关于检查血液凝固机制的实验中不正确的是()。

  • A、全血凝固时间(clotting time,CT)
  • B、激活全血凝固时间(activated coagulation time,ACT)
  • C、白陶土部分凝血活酶时间(kaolin partial thromoplastin time,KPTT)
  • D、血块收缩时间(clot retraction time,CRT)
  • E、凝血酶原时间(prothrombin time,PT)

正确答案:D

第8题:

124 A line manager provides you with three estimates for his activity in your PERT network. His estimates are 2 weeks optimistically, 4 weeks most likely, and 12 weeks pessimistically. The expected time which would appear on the chart would be:

A. 4 weeks

B. 5 weeks

C. 6 weeks

D. 7 weeks

E. None of the above


正确答案:B

第9题:

You are the network administrator of a Layer 3 switched network. Users in one VLAN are complaining thataccess to the server VLAN is very slow from time to time. Traffic in the local VLAN works without any issue,and users in other VLANs do not have any complaint to reach the server VLAN. What is most likely thecause of this issue?()

  • A、routing issue
  • B、denial-of-service attack
  • C、MAC flooding
  • D、spanning-tree recalculation
  • E、Layer 2 loop
  • F、ARP spoofing attack

正确答案:F

第10题:

A user reports it takes a long time to load all applications and the hard drive LED is showing constant activity. Which of the following is MOST likely the issue?()

  • A、The processor is faulty.
  • B、The file system is fragmented.
  • C、The modem drivers are corrupt.
  • D、The power supply is faulty.

正确答案:B

更多相关问题