cat /proc/usr/lparchk
cat /proc/ppc64/lparcfg
/var/adm/tools/res_list
/var/adm/tools/lparalloc
第1题:
A customer has a very large number of physical Windows-based servers and no centralized storage. Which technology solution will help the customer to reduce the footprint of their existing server estate?()
A. z/OS, DS8000, TSM
B. TSM, LTO-5, VMware
C. System x, VMware, XIV
D. System p, VMware, DS5000
第2题:
One of your customer has six sites, three of which process a large amount of traffic among them.He plans to grow the number of sites in the future. Which is the most appropriate design topology?()
第3题:
An administrator notices that some of their systems are reporting a number in the eferred Level?column on the HMC pdates?panel. WhatAn administrator notices that some of their systems are reporting a number in the ?eferred Level?column on the HMC ?pdates?panel.What is the meaning of the eferred Level?is the meaning of the ?eferred Level?()
A.The number denotes the firmware level which will be activated when AIX is next rebooted.
B.The number denotes the firmware level which will be activated when all LPARs are next started.
C.The number denotes the firmware level which will be activated when the managed system is next restarted.
D.The number denotes how many days have elapsed since the firmware was installed without the LPARs being reactivated.
第4题:
A customer has a very large number of physical Windows-based servers and no centralized storage. Which technology solution will help the customer to reduce the footprint of their existing server estate?()
第5题:
A customer wants to expand their current storage environment, but has floor space for only two machine frames or two racks. Their environment consists of IBM SAN Volume Controllers and IBM DS4000 systems. The DS4000 systems are at end of lease. The customer wants the maximum number of disks possible in two frames. Which of the following solutions is best for this customer?()
第6题:
You are the network consultant from pass4sure.com. One of your customer has six sites, three of which process a large amount of traffic among them. He plans to grow the number of sites in the future. Which is the most appropriate design topology?()
A.full mesh
B.peer-to-peer
C.partial mesh
D.hub and spoke
第7题:
Company.com has ordered an 8-way p5-570 and plans to deploy four AIX 5L v5.3 LPARs. The pre-installation system design has all eight processors being placed in the shared processor pool, and four Micro-Partitions being assigned resources from the pool. Prior to the implementation of the system, the customer informs the technical specialist that one of the applications is only supported on AIX 5L 5.2. Which of the following changes to the system design should the technical specialist make to accommodate this change?()
第8题:
A.Network installation manager
B.Boot from installation media
C.A migration install
D.Copy the system using the HMC
第9题:
Companycom has five LPARs, but only one CD drive. How should the CD drive be shared among all the users without system administrator action?()
第10题:
The pSeries technical specialist is designing a two LPAR p5-570 with eight total processors. The system is a test system to run AIX 5.2. The customer has stated a preference for internal disks for the boot devices. The customer has said they may later need to run three or four LPARs without increasing the number of processors. What should the pSeries technical specialist tell the customer about the ability of the p5-570 to meet their requirements?()