Identify four features of WebLogic that provide value above 

题目
多选题
Identify four features of WebLogic that provide value above and beyond a simple Java EE  container.()
A

Active GridLink for RAC

B

support for enterprise Web Services standards beyond Java EE specification

C

Integration with Enterprise Manager

D

market leading performance

E

Java EE6 Specification Support

F

Java SE 7 support

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

By using Project Risk Management techniques, project managers can develop strategies that do all but which of the following:

A Significantly reduce project risks

B eliminate project risks

C provide a rational basis for better decision making

D identify risks, their impact(s), and any appropriate responses

E None of the above.


正确答案:B

第2题:

135 Value engineering/Analysis is the systematic use of techniques which does not include _____. A. establishing values for required functions

B. provide the required functions at the lowest overall cost.

C. identifies the required function of an item

D. seeks to trade performance for cost

E. None of the above.


正确答案:D

第3题:

Continually measuring and monitoring the actual cost versus the budget is done to _____.

A.analyze the reasons for variances

B.establish the variances

C.identify the problems

D.All of the above.

E.None of the above.


正确答案:D
D

第4题:

A customer wants to improve the availability of a web application and provide more predictable scalability when scaling out the application.    Which Feature of WebLogic should you recommend to help solve this problem?()

  • A、Oracle Web Grid
  • B、ActiveCache
  • C、Coherence Grid Edition
  • D、WebLogic Session Replication
  • E、Coherence Web Edition

正确答案:C

第5题:

(b) The management of Division C has identified the need to achieve cost savings in order to become more

competitive. They have decided that an analysis and investigation of quality costs into four sub-categories will

provide a focus for performance measurement and improvement.

Required:

Identify the FOUR sub-categories into which quality costs can be analysed and provide examples (which

must relate to Division C) of each of the four sub-categories of quality cost that can be investigated in order

that overall cost savings might be achieved and hence the performance improved. (8 marks)


正确答案:
(b) Quality costs may be monitored by measuring costs of non-conformance and costs of conformance.
Costs of non-conformance occur when the product fails to reach the design quality standards. Such costs may be subdivided
into internal failure costs and external failure costs.
Internal failure costs occur when the failure is detected before the transfer of the product to the customer.
External failure costs occur when the failure to reach the required standards is not detected until after the product has been
transferred to the customer.
Costs of conformance are those incurred in reducing or eliminating the costs of non-conformance. Such costs may be
subdivided into appraisal costs and prevention costs.
Appraisal costs are those associated with the evaluation of items such as purchased material and services in order to ensure
that they conform. to the agreed specification.
Prevention costs are those associated with the implementation of a quality improvement programme. Such costs are planned
in advance and their implementation should lead to continuous improvement.
Examples of quality costs relevant to Division C may include:
Internal failure costs: cost of materials scrapped due to poor receipt and storage procedures or losses of CC output due to poor
processing routines.
External failure costs: cost of quality problems with batch of CC not detected until it has reached Division B. This may require
free replacement of the batch and compensation for loss of output by Division B.
Appraisal costs: evaluation of purchased material and services in relation to the manufacture of CC to ensure that it conforms
to the agreed specification; e.g. inspection and testing before use.
Prevention costs: the cost of implementation of staff training and the costs of equipment testing to ensure that it conforms to
the specification standards required for the production of CC.
(Alternative relevant examples would be accepted)

第6题:

59 By using Project Risk Management techniques, project managers can develop strategies that do all but which of the following:

A. Significantly reduce project risks

B. eliminate project risks

C. provide a rational basis for better decision making

D. identify risks, their impact(s), and any appropriate responses

E. None of the above


正确答案:B

第7题:

(b) Identify and discuss the appropriateness of the cost drivers of any TWO expense values in EACH of levels (i)

to (iii) above and ONE value that relates to level (iv).

In addition, suggest a likely cause of the cost driver for any ONE value in EACH of levels (i) to (iii), and

comment on possible benefits from the identification of the cause of each cost driver. (10 marks)


正确答案:
(b) A cost driver is the factor that determines the level of resource required for an activity. This may be illustrated by considering
costs for each of the four levels in Order Number 377.
Unit based costs:
Direct material costs are driven by the quantity, range, quality and price of materials required per product unit according to
the specification for the order.
Direct labour costs are driven by the number of hours required per product unit and the rate per hour that has been agreed
for each labour grade.
Batch related costs:
The number of machine set-ups per batch is the cost driver for machines used.
The number of design hours per batch is the cost driver for design work.
Product sustaining costs:
The number of marketing visits to a client per order is the cost driver for marketing cost chargeable to the order.
The number of hours of production line maintenance per order is the cost driver for production line cost.
Business sustaining costs:
These costs are absorbed at a rate of 30% of total cost excluding business sustaining costs. This is an arbitrary rate which
indicates the difficulty in identifying a suitable cost driver/drivers for the range of residual costs in this category. Wherever
possible efforts should be made to identify aspects of this residual cost that can be added to the unit, batch or product related
analysis.
The cost drivers are useful in that they provide a basis for an accurate allocation of the cost of resources consumed by an
order. In addition, investigation of the cause(s) of a cost driver occurring at its present level allows action to be considered
that will lead to a reduction in the cost per unit of cost driver.
Examples of causes that might be identified are:
Material price may be higher than necessary due to inefficient sourcing of materials. This may be overcome through efforts
to review sourcing policy and possibly provide additional training to staff responsible for the sourcing of materials.
The number of machine set-ups per batch may be due to lack of planning of batch sizes. It may be possible for batch sizes
in this order to be increased to 1,250 units which would reduce the number of batches required to fulfil the order from five
to four. This should reduce overall costs.
The amount of production line maintenance (and hence cost) required per order may be reduced by examining causes such
as level of skill of maintenance carried out – by GMB’s own staff or out-sourced provision. Action would involve re-training of
own staff or recruitment of new staff or changing of out-source providers.
(alternative relevant examples and discussion would be acceptable for all aspects of part (b))

第8题:

Value engineering/Analysis is the systematic use of techniques which does not include _____.

A.establishing values for required functions

B.provide the required functions at the lowest overall cost.

C.identifies the required function of an item

D.seeks to trade performance for cost

E.None of the above.


正确答案:D
D

第9题:

(c) (i) Identify and describe FOUR quality control procedures that are applicable to the individual audit

engagement; and (8 marks)


正确答案:
(c) (i) ISQC 1 Quality Control for Firms That Perform. Audits and Reviews of Historical Financial Information and Other
Assurance and Related Services Engagements provides guidance on the overall quality control systems that should be
implemented by an audit firm. ISA 220 Quality Control for Audits of Historical Financial Information specifies the quality
control procedures that should be applied by the engagement team in individual audit assignments.
Procedures include the following:
Client acceptance procedures
There should be full documentation, and conclusion on, ethical and client acceptance issues in each audit assignment.
The engagement partner should consider whether members of the audit team have complied with ethical requirements,
for example, whether all members of the team are independent of the client. Additionally, the engagement partner should
conclude whether all acceptance procedures have been followed, for example, that the audit firm has considered the
integrity of the principal owners and key management of the client. Other procedures on client acceptance should
include:
– Obtaining professional clearance from previous auditors
– Consideration of any conflict of interest
– Money laundering (client identification) procedures.
Engagement team
Procedures should be followed to ensure that the engagement team collectively has the skills, competence and time to
perform. the audit engagement. The engagement partner should assess that the audit team, for example:
– Has the appropriate level of technical knowledge
– Has experience of audit engagements of a similar nature and complexity
– Has the ability to apply professional judgement
– Understands professional standards, and regulatory and legal requirements.
Direction
The engagement team should be directed by the engagement partner. Procedures such as an engagement planning
meeting should be undertaken to ensure that the team understands:
– Their responsibilities
– The objectives of the work they are to perform
– The nature of the client’s business
– Risk related issues
– How to deal with any problems that may arise; and
– The detailed approach to the performance of the audit.
The planning meeting should be led by the partner and should include all people involved with the audit. There should
be a discussion of the key issues identified at the planning stage.
Supervision
Supervision should be continuous during the engagement. Any problems that arise during the audit should be rectified
as soon as possible. Attention should be focused on ensuring that members of the audit team are carrying out their work
in accordance with the planned approach to the engagement. Significant matters should be brought to the attention of
senior members of the audit team. Documentation should be made of key decisions made during the audit engagement.
Review
The review process is one of the key quality control procedures. All work performed must be reviewed by a more senior
member of the audit team. Reviewers should consider for example whether:
– Work has been performed in accordance with professional standards
– The objectives of the procedures performed have been achieved
– Work supports conclusions drawn and is appropriately documented.
The review process itself must be evidenced.
Consultation
Finally the engagement partner should arrange consultation on difficult or contentious matters. This is a procedure
whereby the matter is discussed with a professional outside the engagement team, and sometimes outside the audit
firm. Consultations must be documented to show:
– The issue on which the consultation was sought; and
– The results of the consultation.

第10题:

Identify four valid requests in a RESTful service using JAX-RS.()

  • A、GET
  • B、PUT
  • C、UPDATE
  • D、DELETE
  • E、POST
  • F、REMOVE

正确答案:A,B,D,E

更多相关问题