Update the time and date in the BIOS.
Update the firmware on the SCSI controller.
Update the firmware to the latest version.
Configure IPMI on the new board.
第1题:
A、finished
B、was finishing
C、has finished
D、had finished
第2题:
The network administrator has just finished installing a new 10/100/1000 switch, but receives reports from the server administrator that servers connected to the new switch seem to be experiencing slow LAN connections. The network administrator checks the port connecting the new switch to the core switch and sees the following information:Which of the following is the MOST likely cause of the slow connections?()
A. The servers have not had VLAN tagging enabled on their NICs.
B. Speed and duplex have not been set.
C. VLAN tagging was not set on the trunk.
D. The servers have been connected with CAT5 cable.
第3题:
When I saw him, he has finished the letter .
第4题:
A client is having problems connecting remotely after replacing a router. An administrator has just created an action plan. Which of the following is the NEXT step the administrator should perform to resolve this issue?()
第5题:
第6题:
A、yet, already
B、already, yet
C、ever, never
D、still, just
第7题:
A. Perform a full system backup.
B. Follow up with the customer, verifying satisfaction.
C. Ask their manager to contact the customer.
D. Perform a complimentary virus scan.
第8题:
I have just finished the()in the online forum.
A. discussion
B. assignment
C. examination
第9题:
Threefourths of the homework()today.
第10题:
You have finished physically installing an access point on the ceiling at your officE.At a minimum, which paramenter must be configured on the access point in order to allow a wireless client to operate on it?()