All of the partitions can be managed in one group mixing dedicated and shared processors. PLM will move resources in the group as setup in the PLM profiles.
PLM handles memory, dedicated and shared processor partitions. All the partitions in a group must be of the same processor type. PLM moves I/O resources between partitions based on PLM policy files.
PLM handles memory, dedicated and shared processor partitions. The policy file, once loaded, is static and has no knowledge of workload on the managed partitions. PLM is supported for partitions that are running AIX 5.2 or i5OS.
All of the partitions in a group must be the same type, either all dedicated processor partitions or shared processor partitions. One PLM Server can manage multiple groups of partitions. PLM does not move resources between groups.
第1题:
Companycom wants to apply a PTF to the p5 590 system. After doing a preview install, the output shows there is insufficient space in the /usr filesystem. The root volume group has no available physical partitions left. They do not want to add additional disk drives to the system, but have a jfs2 filesystem that is only 8% used. What could they do to utilize space in the jfs2 filesystem to apply this PTF?()
第2题:
Companycom is considering a partitioned solution which will require cumulative rPerf total of 150. The original sizing came back recommending a 32-way p5 590. However, they have a requirement for future scalability and availability is important. Which of the following would be the best reason to recommend a p5 595?()
第3题:
For the p5 590 and p5 595 servers, the HMC must be directly attached. Why is the use of a private service network between HMC and the p5 590 required?()
第4题:
Companycom has a p690 server with unused fiber (HBA) host bus adapters (feature code 6228) that they would like to reuse. They are interested in implementing Advanced Power Virtualization features particularly Virtual IO. What is the best way to proceed?()
第5题:
Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()
第6题:
Companycom is installing a p5 590 with a HMC to manage LPARs. The customer is very concerned about security and wants to restrict network traffic that is not necessary. What is necessary for communication between the LPARs and the HMC?()
第7题:
Companycom has just added some new disk drives to a p5 590. The customer needs to know the largest Logical Track Group that these drives will support. What is the best way to locate this information?()
第8题:
Companycom has seven days of vmstat data on four p5 590 production LPARs of four processors each. The data shows that all four LPARs have periodic utilizations of 90-95% lasting several minutes in duration. However, the average utilizations of the four LPARs were between 15-30%. The vmstat data shows that the peak utilizations of each LPAR do not occur at the same time. Which of the following should be set up?()
第9题:
Companycom has several AS/400 servers in their IT infrastructure running V5R2 that they wish to consolidate. The customer wants to simplify their environment and install i5/OS on a p5 590 with 16 1.65GHz processors and 20 i5/OS partitions. The customer plans to use the Advanced Power Virtualization to share their storage, processors, and memory. What considerations and limitations should be reviewed with the customer before the purchase?()
第10题:
A customer wants to run DB2 on a Power 780 with uncapped partitions. They have licensed DB2 for 32 of the 64 active cores, and will use it in multiple partitions. How can the customer ensure that the number of licenses purchased for DB2 is not exceeded?()