Configure VIO Server Express Edition to control the tape library through one fibre channel card.Assign the library to the production partitions when needed.
Configure the IBM i partition to own the tape library.Use IBM i virtualization to host a virtual tape library connection to the AIX and Linux partition.Assign the library to the production partitions when needed.
Configure a fibre channel card for each partition, and a configure fibre switch.Connect the partitions and tape library to the switch.Zone the switch so all partitions can enable the tape when needed and disable the tape when finished.
Configure AIX to control the tape library through one fibre channel adapter.Use AIX virtualization to host a virtual tape library connection to the IBM i and Linux partitions.Assign the library to the production partitions when needed.
第1题:
A.1
B.2
C.10
D.20
第2题:
An HACMP cluster is planned for two logical partitions on IBM p690 servers. Both partitions have three network interface adapters: two service adapters on a production network connected to an IP switch, and an administration adapter on a stand-alone hub that is connected to the p690 server’s HMC. Non-IP hearbeat paths cannot be configured due to the available hardware in the p690 servers. Given the resources available,what is the best configuration for this cluster?()
第3题:
此题为判断题(对,错)。
第4题:
A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()
第5题:
Company.com has ordered an 8-way p5-570 and plans to deploy four AIX 5L v5.3 LPARs. The pre-installation system design has all eight processors being placed in the shared processor pool, and four Micro-Partitions being assigned resources from the pool. Prior to the implementation of the system, the customer informs the technical specialist that one of the applications is only supported on AIX 5L 5.2. Which of the following changes to the system design should the technical specialist make to accommodate this change?()
第6题:
Which report will provide information on the most recently completed plan?()
第7题:
Companycom is planning to do server consolidation on POWER5. The customer has a test environment, a QA environment and a production environment for two applications. Both the test and QA environments are very small and are only utilized when new releases are being developed and tested. They require less than 1 CPU each. Both production applications require 2 CPUs for day-to-day operation and can require up to an additional 2 CPUs each during abrupt peak requirements. What is the best design for the LPARs?()
第8题:
A. Merge partitions of a list partitioned table
B. Drop partitions of a list partitioned table
C. Coalesce partitions of a hash-partitioned global index.
D. Move partitions of a range-partitioned table
E. Rename partitions of a range partitioned table
F. Merge partitions of a reference partitioned index
第9题:
A system is being planned with three production partitions, one each for an IBM i, AIX standard edition, and Power Linux applications. One fibre-channel attached TS3100 tape library will be shared between the partitions for backup. Which solution provides tape library sharing with minimum operator intervention?()
第10题:
A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware. Which of the following meets these requirements?()