第1题:
What IBM resource helps to easily identify a business application that has been validated on IBM Systems?() NOTE:// Solutions that are in this resource represent applications that enable IBM Systems and verify, through customer experience, installing and running in a customer location.
第2题:
A customer has an 8-way p650 running an application for about 200 users. In the past, the requiredamount of memory and processors has increased proportionally to the number of new users. The customer plans to increase users by 10% each year for the next three years. Next year, a database will be added to the workload to support the users directly rather than being on a separate machine. What is the most likely result of this projected growth?()
第3题:
A.1
B.2
C.3
D.4
第4题:
Company.com has a two-way p5-520 that will be running three shared processor Micro-Partitions consuming 60 percent of system resources. Immediately prior to shipment, the customer discovered they need to run a fourth server that requires AIX 5L V5.2. Which of the following will satisfy this requirement?()
第5题:
An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()
第6题:
An enterprise has a web application running both HTTP and HTTPS. How many Clusters must becreated?()
第7题:
A company needs additional storage for a block I/O based database application. The application has low I/O bandwidth requirements across the campus. The customer has a TCP/IP infrastructure and is interested in low-cost products that are compatible with its environment. Which technology is most appropriate for this customer?()
第8题:
A financial customer has three data centers that are approximately five kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds between the three sites.Which of the following solutions satisfies the customer‘s recovery time objective?()
A. DS8700 systems at each site running Metro Mirror
B. DS5300 systems at each site running Metro Mirror
C. DS5100 systems at each site running Global Mirror
D. XIV systems at each site running synchronous mirroring
第9题:
A customer is experiencing problems with a failed disk drive on their newly purchased p630 server. The IBM CE has replaced the disk and now the mirrored Logical Volume needs to be re-created. The customer does not have the skills to do this. There is no support contract with the solution provider but the p630 is covered under a Software Maintenance Agreement (SWMA) 24/7 contract. What should the pSeries technical specialist do first?()
第10题:
A customer has a key application running in a logical partition on a POWER5 system. The customer wants the ability to run the application with minimal down time using Live Partition Mobility. Which of the following is the minimum PowerVM edition and hardware configuration that will support the customer requirement?()