a, b, c, d
b, d, e, c
a, b, d, e, c
b, f, d, f, c
b, d, a, c
第1题:
第2题:
Which of the following steps are necessary in order to add a new VLAN to a switched network?()
第3题:
Which order of steps is followed in carrying out the project?
A. Assessment-Prototype-Design-Construction.
B. Assessment-Design-Prototype-Construction.
C. Design-Assessment-Prototype-Construction.
D. Design-Prototype-Assessment-Construction.
第4题:
Which two are correct steps in taking a binary backup of MyISAM tables?()
第5题:
Which of the following is the correct sequence of order states during normal order processing?()
第6题:
A. Create the VLAN.
B. Name the VLAN.
C. Configure an IP address for the VLAN.
D. Add the desired ports to the new VLAN.
E. Add the VLAN to the VTP domain.
第7题:
What are the four steps, in their correct order, to mitigate a worm attack?()
第8题:
Given the following steps, which would be the correct order to create a backup of an Oracle database in NOARCHIVELOG mode?()1.shutdown immediate from RMAN2.Log into RMAN3.startup mount from RMAN4.backup database5.alter database open6.backup database plus archivelog delete input
A.2,3,1,4,5
B.2,1,3,6,5
C.1,3,5,4
D.2,1,3,5,6
E.2,1,3,4,5
第9题:
An administrator determines that performance has degraded for a WebSphere Commerce database. Which of the following steps should be performed to correct this problem?()
第10题:
A server is experiencing an undetermined problem. Which of the following steps should the technician take in order to identify whether it is a software or hardware problem?()