Hotsite
Coldsite
Warmsite
Failoversite
第1题:
A. disaster recovery strategy
B. the number of IOPS required
C. the capacity of each hard drive
D. how the database will be backed up
第2题:
Which of the following is the MOST important step in any disaster recovery plan?()
第3题:
A. Emergency exits
B. The test plan
C. Payroll
D. All IT contact numbers
第4题:
Which of the following is the MOST important step in preparing for disaster recovery?()
第5题:
Which of the following replication methods provides a disaster recovery system with minimal downtime to normal operations?()
第6题:
Which of the following disaster recovery sites requires power and cabling to be run before it can be used?()
第7题:
Which of the following is a distinguishing factor between data archiving and data backups?()
第8题:
A.Hotsite
B.Coldsite
C.Warmsite
D.Failoversite
第9题:
Which of the following is MOST important to include on the disaster recovery documentation?()
第10题:
Which of the following disaster recovery sites requires power and cabling to be run before it can be used?()